SBP - Sensor Board Pulse
10.99
Start-up
Siemens AG 6SE7087-6NX84-2FA0
SIMOVERT MASTERDRIVES
Operating Instructions
5-1
5
Start-up
After installation of the SBP optional board has been completed, an automatic
self-test is carried out when the basic unit (converter/inverter) is powered up.
NOTE
Please refer to the documentation for the respective basic unit regarding
instructions for parameterization using the quick procedure.