SIMATIC PN/J1939 LINK
Operating Instructions, 12/2018, A5E45307564-AA
61
Maintenance and service
11
11.1
Firmware update
Procedure
1. Set the S7 CPU to "STOP".
2. Initiate the update of the PN/J1939 LINK in the TIA Portal. Depending on the
configuration in the TIA Portal, the PN/J1939 LINK resumes running on its own after a
successful update and waits for configuration information from the S7 controller.
3. For operation, set the S7 CPU back to "RUN".
CAUTION
Critical plant state
The Ethernet switch integrated in PN/J1939 LINK is only operational once the PN/J1939
LINK starts up. Restarting the PN/J1939 LINK interrupts the Ethernet switch function.
Existing Ethernet connections via the switch are thus interrupted for the duration of the
PN/J1939 LINK startup. This can result in critical plant states.
11.2
Replacing PN/J1939 LINK
Below you will find a description of the basic steps required for replacing the PN/J1939 LINK.
Preparations
Disconnect the S7 setup including PN/J1939 LINK from the power supply.
Содержание SIMATIC PN/J1939 LINK
Страница 1: ...SIEMENS siemens com ...
Страница 2: ......
Страница 44: ...Connecting 7 6 Connecting the J1939 bus SIMATIC PN J1939 LINK 42 Operating Instructions 12 2018 A5E45307564 AA ...
Страница 74: ...Appendix A 4 Service Support SIMATIC PN J1939 LINK 72 Operating Instructions 12 2018 A5E45307564 AA ...