Batch
8-17
SIMATIC PCS 7 OSx 4.1.2 Operator
To change the operational state of a unit, select
State
on the unit tag detail.
OSx displays the unit state options (
Other functions built into the batch program by the plant engineer can
cause other processes to occur when the operator selects the
State
options.
Alarm Group:
Alarm State Sequencing:
Alarming:
State:
Tag: UNIT_1
Tag Type: UNIT
Scan Status: Active
Batch ID: Dutch Cookies
P/C: C1
Figure 8-14
Changing Unit Tag State
Changing the State
of a Unit
Содержание SIMATIC PCS 7 OSx
Страница 6: ......
Страница 12: ...viii Contents Appendix A Advanced Operator Tasks A 1 Index Index 1 ...
Страница 22: ...Preface xviii SIMATIC PCS 7 OSx 4 1 2 Operator ...
Страница 102: ...OSx Station Control 2 20 SIMATIC PCS 7 OSx 4 1 2 Operator ...
Страница 124: ...Trends 4 12 SIMATIC PCS 7 OSx 4 1 2 Operator ...
Страница 172: ...Action Requests 7 20 SIMATIC PCS 7 OSx 4 1 2 Operator ...
Страница 192: ...Batch 8 20 SIMATIC PCS 7 OSx 4 1 2 Operator ...
Страница 205: ...Reports 9 13 SIMATIC PCS 7 OSx 4 1 2 Operator Figure 9 7 Entering Time Schedule Data ...
Страница 222: ...Navigation A 2 SIMATIC PCS 7 OSx 4 1 2 Operator ...