Commissioning
7.3 Commissioning - Windows XP Professional
SIMATIC IPC427C
40
Operating Instructions, 04/2009, A5E02414743-01
7.3
Commissioning - Windows XP Professional
7.3.1
Basic commissioning - initial startup
Requirements
●
The device is connected to the 24 VDC power supply.
●
Equipotential bonding is connected.
●
The cables are correctly plugged in.
Configuring the operating system
When the computer is started with the power switch for the first time, the Windows XP
Professional operating system on the hard disk or SSD drive is configured automatically.
Proceed as follows:
1.
Switch the device on using the On/Off switch. The PC performs a self-test (POST).
During the self-test, this message appears:
Press F2 go to Setup Utility or
Press ESC go to Boot Manager
2.
Wait until this message is cleared, then follow the instructions on the screen.
NOTICE
The device may not be switched off at any time during the installation process.
Do not change the default BIOS settings, otherwise the operating system setup may
become corrupted.
3.
Automatic restart
After you have entered all necessary information and the operating system is configured,
the PC is automatically restarted and displays the user interface of the operating system.
Note
System startup can take considerably longer than usual for the initial commissioning.
When you switch on the PC now, the user interface of the Windows XP Professional
operating system is automatically opened when the startup routine is completed.
Note
To prevent data loss, it is advisable to create an image of your system partition after initial
commissioning.
Содержание SIMATIC IPC427C
Страница 154: ...List of abbreviations C 1 Abbreviations SIMATIC IPC427C 154 Operating Instructions 04 2009 A5E02414743 01 ...
Страница 166: ...Glossary SIMATIC IPC427C 166 Operating Instructions 04 2009 A5E02414743 01 ...
Страница 170: ...Index SIMATIC IPC427C 170 Operating Instructions 04 2009 A5E02414743 01 ...