An operating system is already installed in the CPU module in the delivery state of the SIMATIC
CN 4100.
After the first power-on, the operating system installs itself. In addition, the operating system
prepares the services so that an initial setup can be performed. The entire process takes about
8 minutes. After the setup phase, the SIMATIC CN 4100 can be configured for use in the plant.
Description of the commissioning
Commissioning has to be done for all CPU modules. The following manuals describe the
commissioning procedure:
• CNET Operating Manual (
https://support.industry.siemens.com/cs/de/de/view/109802239
Note
Adhere to the sequence
The SIMATIC CN 4100 image may only be installed after all modules have been installed. If you
want to use communications modules, you must install them before the image installation.
Phases of commissioning
Commissioning is divided into phases and can be tracked by the status display.
Useful information on the commissioning phases (Page 45)
7.1
Useful information on the commissioning phases
There are LEDs on the CPU module to indicate the status of commissioning.
Status LEDs of the CPU module (Page 53)
Each phase of commissioning can be tracked by a certain sequence of status changes of the
LEDs.
CN 4100 Communication System
Equipment Manual, 10/2021, A5E50871363-AA
45
Содержание SIMATIC CN 4100
Страница 6: ...Table of contents CN 4100 Communication System 6 Equipment Manual 10 2021 A5E50871363 AA ...
Страница 8: ...Security information CN 4100 Communication System 8 Equipment Manual 10 2021 A5E50871363 AA ...
Страница 50: ...Commissioning 7 2 Phases CN 4100 Communication System 50 Equipment Manual 10 2021 A5E50871363 AA ...
Страница 56: ...Operation 8 3 LEDs of the RJ45 port CN 4100 Communication System 56 Equipment Manual 10 2021 A5E50871363 AA ...