Configuration options
When the product ships, all DIP switches are set to ON.
Switch
Status
Meaning
Settings for ring ports with R1
and R2
RM
OFF
The SCALANCE X414-3E is not redundancy manager.
- -
ON
SCALANCE X414-3E is redundancy manager.
- -
STBY
- -
No function.
- -
R1
R2
OFF
OFF
The two ports on slot 5 (gigabit ports) are ring ports.
Select this setting if you operate the SCALANCE X414-3E without
media modules. With all other settings, ring ports are selected that
are not available during operation without plugged-in media mod-
ules.
R1
R2
ON
OFF
Ports 1 and 2 of slot 6 are ring ports.
R1
R2
OFF
ON
Port 1 of slot 6 is the first ring port.
Port 1 of slot 7 is the second ring port.
All other ports on slots 6 and 7 can be used for optical connection
of remote nodes or subnets.
Содержание SCALANCE X-400
Страница 6: ...Table of contents SCALANCE X 400 6 Operating Instructions 06 2015 C79000 G8976 C186 12 ...
Страница 10: ...Introduction 1 1 Preface X400 SCALANCE X 400 10 Operating Instructions 06 2015 C79000 G8976 C186 12 ...
Страница 12: ...Safety instructions SCALANCE X 400 12 Operating Instructions 06 2015 C79000 G8976 C186 12 ...