Chapter 2
Installing the Device
RUGGEDCOM RS910W
Installation Guide
14
Connecting High AC/DC Power
CAUTION!
Electrical hazard – risk of damage to equipment. Before testing the dielectric strength (HIPOT) in the
field, remove the braided ground cable connected to the surge ground terminal and chassis ground.
This cable connects transient suppression circuitry to chassis ground and must be removed in order to
avoid damage to transient suppression circuitry during testing.
NOTE
Torque all terminal connections to 0.6 N·m (5 lbf-in).
1. Secure the power terminal block to the device.
2. Connect the positive wire from the power source to the positive/live (+/L) terminal on the terminal block.
4
1
2
3
Figure 6: Terminal Block Wiring
1.
Positive/Live (+/L) Terminal
2.
Negative/Neutral (-/N) Terminal
3.
Surge Ground Terminal
4.
Braided Ground Cable
Содержание RUGGEDCOM RS910W
Страница 4: ...RUGGEDCOM RS910W Installation Guide iv ...
Страница 10: ...Preface RUGGEDCOM RS910W Installation Guide x Customer Support ...
Страница 16: ...Chapter 1 Introduction RUGGEDCOM RS910W Installation Guide 6 Supported Fiber Optic Cables ...
Страница 28: ...Chapter 2 Installing the Device RUGGEDCOM RS910W Installation Guide 18 Connecting Low DC Power ...
Страница 40: ...Chapter 4 Communication Ports RUGGEDCOM RS910W Installation Guide 30 Connecting Multiple RS485 Devices ...