RB-6 L-801A (Airport) Rotating Beacon (Export)
Installation
2001 Siemens Airfield Solutions, Incorporated
96A0221B
Page 3-2
All rights reserved
Issued 5/01
See Figure 7-1 the
Wiring Schematics
section for final assembly wiring
diagram. An AWG 10, S0-3 power cord (user supplied) must be attached
to the beacon.
To install power cord, perform the following procedure:
1.
Remove the motor box cover plate and gasket by removing the four
screws (7/16 wrench required) on the front of the motor box.
2.
Route the cable through side hole into box.
3.
Connect the power cord at the terminal strip as shown in Figure2-2 in
the
Description
section.
4.
Attach 3-conductor black wire (120 VAC) to terminal marked Ll, white
wire (neutral) to terminal marked N, and green wire (ground) to the
ground lug in the base of the box.
See Figure 2-3 the
Description
section. The optional heater assembly,
when ordered, is pre-wired at the factory. The power cord for the heater
assembly should be connected from a separate circuit breaker to terminal
block TB1 terminals L1
H
and N so the heater can be operated when the
beacon is off.
All beacons are shipped from the factory preset at an angle of 5 degrees.
To adjust the beacon angle needs, perform the following procedure:
1.
See Figure 3-1. Loosen the wing nut (4) holding the head in place.
2.
Slide the elevation adjustment device (3) to the desired angle and
tighten nut.
Wiring
Optional Heater Wiring
Angle Adjustment