Siemens PMI-2 Скачать руководство пользователя страница 6

Siemens Industry, Inc.
Building Technologies  Division
Florham Park, NJ

Siemens Canada Limited
Building Technologies  Division
2 Kenview Boulevard
Brampton, Ontario L6T 5E4 Canada

P/N 315-050636-1

Configuration dialog will display information on the PMI firmware and
system configuration currently stored in the panel. You can select the
configuration to upload (if there are multiple compiled configurations
in the host PC), and also choose to download the PMI’s current
history file into the project directory.

ii) Once you have begun the transfer, the Transfer Progress dialog

displays transfer progress and status messages, and allows you to
cancel the transfer. When you click OK at the transfer complete
message, the control panel will reset itself with the new configuration.

ELECTRICAL RATINGS

r

e

w

o

P

t

u

p

n

I

r

e

w

o

P

t

u

p

t

u

O

t

n

e

r

r

u

C

e

n

a

l

P

k

c

a

B

V

4

2

A

m

5

9

1

d

n

a

T

E

N

X

/

T

E

N

H

h

c

a

E

r

i

a

P

k

r

o

w

t

e

N

N

A

C

.

x

a

m

k

a

e

p

o

t

k

a

e

p

V

8

t

n

e

r

r

u

C

V

4

2

l

a

n

i

m

r

e

T

w

e

r

c

S

0

.

g

s

m

g

n

i

r

u

d

(

.

x

a

m

A

m

5

7

)

n

o

i

s

s

i

m

s

n

a

r

t

t

n

e

r

r

u

C

e

n

a

l

P

k

c

a

B

V

2

.

6

0

t

n

e

r

r

u

C

y

b

d

n

a

t

S

V

4

2

A

m

5

2

1

Содержание PMI-2

Страница 1: ... PMI 2 contains the site specific program as developed in Zeus All system logic and supervision is provided by the controller in the PMI 2 The PMI 2 contains a full VGA LCD Touch Screen and LEDs for display ing system status An audible sounds when there are unacknowledged events on the PMI 2 The display is surrounded by keys that are used to control the displayed information and to navigate throug...

Страница 2: ...a b d n a e s a b a t a d 2 D S I M P G w o l l a o t d e s u t r o p d r a c D S y t i l i b a p a c S U T A T S l a m r o n e t a c i d n i o t t h g i l s t n e m g e s g n i k l a W n a f i d e y a l p s i d s i e d o c r o r r E n o i t a r e p o d e t c e t e d s i D I r o r r e l a n r e t n i 5 C C O T 5 C C o t e l b a c n o b b i r n i p 0 6 s t c e n n o C M V L O T s u b o i d u a g o ...

Страница 3: ... o i t p O 4 S n o g n i t t e s o N t i g i d o w t e h t o t s s e r d d a e d o n T E N X e h t t e S s u e Z n i t i r o f d e n g i s s a s s e r d d a N O o t 4 n o i t i s o p h c t i w s s n o i t p O 7 1 S t e S t i g i d e e r h t e h t o t s s e r d d a e d o n T E N X e h t t e S s u e Z n i t i r o f d e n g i s s a s s e r d d a s u e Z n i g n i t t e S m o r f s s e r d d a e d o n...

Страница 4: ...he local audible Once all events are acknowl edged a reset button becomes available in the lower right side of the display If notification appliances were active two additional buttons appear at the bottom of the screen These allow the operator to silence or unsilence the notification appli ances When the notification appliances are silenced the Audibles Silenced LED lights The system can only be ...

Страница 5: ...he Zeus tool replace the PMI with the new PMI 2 Please make sure you are converting the correct PMI with a PMI 2 by matching the address of the switches on the back of the PMI a In the configuration which you have just removed from the original PMI click on the PMI module in the physical tree Select the Edit menu and click on Find ReplaceTree Node A dialog box will open and allow you to replace th...

Страница 6: ... into the project directory ii Once you have begun the transfer theTransfer Progress dialog displays transfer progress and status messages and allows you to cancel the transfer When you click OK at the transfer complete message the control panel will reset itself with the new configuration ELECTRICAL RATINGS r e w o P t u p n I r e w o P t u p t u O t n e r r u C e n a l P k c a B V 4 2 A m 5 9 1 ...

Отзывы: