Siemens P1 BIM Скачать руководство пользователя страница 2

Document No. 553-140 
Installation Instructions 
November 4, 2019 

Page 2 of 4

 

Siemens Industry, Inc.

 

Power Requirements 

One of the following power sources is pulled to the 
enclosure: 

 

120 Vac, 60 Hz and terminated at the 115V 
PX Series Service Box. 

 

230 Vac, 50/60 Hz and terminated at the 230V 
PX Series Service Box. 

 

24 Vac, 50/60 Hz Class 1 power limited from a 
third-party transformer and connected to a 
terminal block. 

 

If powering a TX-I/O expansion panel, power 
wiring is run from the transformer in the 
primary panel to the expansion panel, if 
needed. 

 

CAUTION: 

 

For information on extending the TX-I/O 
island bus outside the enclosure, see the 

APOGEE Wiring Guidelines for Field 
Panels and Equipment Controllers

 

(125-3002). 

General Installation Requirements 

 

CAUTION: 

 

All devices not isolated by an Island Bus 
Expansion module (TXA1.1BE) must be 
connected to the same grounding point. 

 

CAUTION: 

 

Do not connect TX-I/O components to a 
floating system neutral. Otherwise, 
equipment damage will occur. 

 

System Neutral ( ) must be 
continuous throughout the TX-I/O 
Bus.  

 

System Neutral must be connected 
to building approved earth-ground 

( ) at a single point only at the 
24 Vac transformer. 

Installation 

 

CAUTION: 

 

Turn OFF AC power at the ON/OFF 
switch in the Service Box or 
transformer enclosure. 

 

CAUTION: 

 

UL Listings require that NEC Class I 
and Class II wiring be kept separate 
from each other. Use separate conduit 
and cable tie bars to separate Class I 
Digital Output (DO) wires from all other 
Class II wiring.  

 

CAUTION: 

 

The TX-I/O island bus must extend 
from the male bus connector of the P1 
Bus Interface Module (BIM). 

The P1 BIM supplies 24 Vac, 
24 Vdc, and communication to I/O 
modules on the male bus 
connector. 

 

 

CAUTION: 

 

Only insert or remove the P1 BIM, TX-
I/O Power Supply, and Bus Connection 
Module when the power is OFF. 

 

This device includes electrical and 
electronic components and must not 
be disposed of as domestic waste. 
Product recovery and disposal must 
comply with all national and local 
regulations. 

 

NOTE: 

 

For Smoke Control applications, the 
field panel controller must be installed 
in the lower half of the enclosure. 

For more information, see 

TX-I/O I/O 

Modules Installation for UL 
Applications Installation Instructions

 

(553-141) and 

TX-I/O Power Supply 

and Bus Modules Installation 
Instructions

 (553-142). 

 

Содержание P1 BIM

Страница 1: ... as specified CAUTION Equipment damage or loss of data may occur if you do not follow a procedure as specified Required Tools and Materials Wire stripper side cutter Small flat blade screwdriver Digital multimeter DMM Expected Installation Time 7 minutes Prerequisites CAUTION No power wiring is connected to the field panel controller or other TX I O components at this time CAUTION The TX I O islan...

Страница 2: ...us System Neutral must be connected to building approved earth ground at a single point only at the 24 Vac transformer Installation CAUTION Turn OFF AC power at the ON OFF switch in the Service Box or transformer enclosure CAUTION UL Listings require that NEC Class I and Class II wiring be kept separate from each other Use separate conduit and cable tie bars to separate Class I Digital Output DO w...

Страница 3: ...X I O island bus connector 5 Push in each mounting tab until it clips onto the DIN rail Connecting Devices to the TX I O Island Bus Completing the Installation CAUTION For RS 485 ALN or FLN terminate only one end of the shield wire on the enclosure earth ground For a 3 wire system terminal is connected to reference wire Protective ground terminal may be connected to earth ground For a 2 wire syste...

Страница 4: ...ed in the USA Page 4 of 4 Configuring the 4 Module P1 BIM 1 Power up the P1 BIM 2 Plug in the USB on both ends the device side to the P1 BIM the host side to the computer The device will be automatically recognized and installed 3 Open Windows Explorer 4 Find the USB device drive will say SIEMENS P1BIM Configuration Tool in the drives list 5 Open the drive 6 Double click P1BIMCFG exe to launch the...

Отзывы: