15-6
Equipment Manual OP7, OP17
Release 04/99
15.4
Testing the Configuration in OFFLINE Mode
In OFFLINE mode, you can test the different functions and the configura-
tions downloaded from the PC or PU independently of the PLC.
In OFFLINE mode, tags are not updated.
Step
Procedure
1
Switch the OP to OFFLINE mode using the standard screen
System settings
!
OPMode.
2
Check all configured screens for proper display.
3
Check the screen hierarchy.
4
Check the input fields.
5
Test the soft keys.
6
Check the different items of message text.
7
Test the function keys.
If errors occur when you perform the tests, you must download the configura-
tion again.
Purpose
Procedure
End of test
Содержание OP17
Страница 8: ...iv Equipment Manual OP7 OP17 Release 04 99 Preface ...
Страница 13: ...Product Description 1 Functionality 2 Part I Introduction ...
Страница 14: ...2 2 Equipment Manual OP7 OP17 Release 04 99 ...
Страница 24: ...1 10 Equipment Manual OP7 OP17 Release 04 99 ...
Страница 28: ...2 4 Equipment Manual OP7 OP17 Release 04 99 ...
Страница 30: ...2 6 Equipment Manual OP7 OP17 Release 04 99 ...
Страница 76: ...7 16 Equipment Manual OP7 OP17 Release 04 99 ...
Страница 92: ...9 6 Equipment Manual OP7 OP17 Release 04 99 ...
Страница 98: ...10 6 Equipment Manual OP7 OP17 Release 04 99 ...
Страница 100: ...10 8 Equipment Manual OP7 OP17 Release 04 99 ...
Страница 106: ...11 6 Equipment Manual OP7 OP17 Release 04 99 ...
Страница 111: ...Installation 14 Commissioning 15 Device Description 16 Part IV Commissioning and Description of Devices ...
Страница 112: ...13 4 Equipment Manual OP7 OP17 Release 04 99 ...
Страница 140: ...16 10 Equipment Manual OP7 OP17 Release 04 99 ...
Страница 142: ...P 12 Equipment Manual OP7 OP17 Release 04 99 ...
Страница 164: ...B 20 Equipment Manual OP7 OP17 Release 04 99 ...