Siemens NET-7 Скачать руководство пользователя страница 3

3

Figure 2   NET

-7 W

iring Diagram

MMB

MOM-4

MOM-4

PSR-1

PSR-1

USE

ONL

Y

WITH

MMB-1

SEE

NOTE

3.

SEE

NOTE

2.

NOTES: 1.

THE

NET

-7

IS

NOT

COMP

ATIBLE

WITH

THE

PS-5N.

2.

TO

CONNECT

A

NET

-7

TO

A

MOI,USE

A

MER-8

CABLE

FROM

P5

ON

THE

MOI-7

TO

P6

ON

A

PSR-1

THA

T

HAS

A

NET

-7

INST

ALLED

IN

IT

.

3.

USE

THE

120

¼W

,5

%

END

OF

LINE

RESIST

OR

OR

RESIST

OR

ASSEMBL

Y,

AS

APPLICABLE:

P/N

140-820150

(MMB-1/-2)

OR

P/N

140-049099

(MMB-3).

4.

FOR

MMB-2,

SET

JUMPER

P15

TO

S7

WHEN

USING

NET

-7.

(SEE

MMB-2

INST

ALLA

TION

INSTRUCTIONS,

P/N

315-095097.)

5.

WHEN

USING

MMB-3

W

ITH

A

NET

-7

INST

ALLED

IN

MAIN

ENCLOSURE,

WIRING

MUST

BE

CONNECTED

AT

THE

NET

-7

ONL

Y.

SET

JUMPER

P7

TO

POSITION

2,3.

(SEE

MMB-3

INST

ALLA

TION

INSTRUCTIONS,

P/N

315-048860.)

-

CSG-M

CONFIGURA

TION

MUST

BE

LOADED

VIA

NET

-7

PROGRAMMING

POR

T

(P1).

-

MAKE

SURE

THE

CSG-M

SETTING

“LOCAL

NETWORK

COMM

STYLE”

IS

SET

TO

STYLE

7

AND

“MMB-3

MNET

STYLE

7”

IS

SET

TO

NO.

6.

REFER

TO

WIRING

SPECIFICA

TION

FOR

MXL,

MXL-IQ

AND

MXL

V

SYSTEMS,

P/N

315-091772

REVISION

6

OR

HIGHER,

FOR

ADDITIONAL

WIRING

INFORMA

TION.

S

18

AW

G

M

IN.

80

MAX.

PER

PA

IR

USE

TWISTED

PA

IR

OR

SHIELDED

TWISTED

PA

IR.TERMINA

TE

THE

SHIELD

AT

THE

MMB

ENCLOSURE

ONL

Y.

POWER

LIMITED

TO

NFP

A

70

PER

NEC

760.

MAX.

VOL

TAGE

8V

P-P

.

MAX.

CURRENT

150mA.

EACH

PA

IR

IS

INDEPENDENTL

Y

SUPER

VISED

BY

NET

-7s

AT

THE

ENDS

OF

THE

NETWORK.

S

Содержание NET-7

Страница 1: ...to the modules in the enclosure In normal operation the SELECT LED turns on and off every time there is network activity If this LED remains in one state either on or off it indicates that one or both of the pairs is not functional The SELECT LED lights when the PRIMARY pair is selected The NET 7 can also provide a Style 4 communication mode In that configuration all NET 7s must be set to Style 4 ...

Страница 2: ...e to the board 7 Install the NET 7 into the MOM 4 slot Be sure that the board is firmly seated in the card edge connector This completes the installation of the NET 7 with the MMB 8 When used with a PSR 1 install the NET 7 into connector P7 If screws are in the location where the card guide is to be installed remove the screws and mount the card guide with the hardware supplied Mount the two card ...

Страница 3: ... INSTALLED IN MAIN ENCLOSURE WIRING MUST BE CONNECTED AT THE NET 7 ONLY SET JUMPER P7 TO POSITION 2 3 SEE MMB 3 INSTALLATION INSTRUCTIONS P N 315 048860 CSG M CONFIGURATION MUST BE LOADED VIA NET 7 PROGRAMMING PORT P1 MAKE SURE THE CSG M SETTING LOCAL NETWORK COMM STYLE IS SET TO STYLE 7 AND MMB 3 MNET STYLE 7 IS SET TO NO 6 REFER TO WIRING SPECIFICATION FOR MXL MXL IQ AND MXLV SYSTEMS P N 315 091...

Страница 4: ...OXXO OXXXOXXX 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 XOOOOOXX XOOOOXOO XOOOOXOX XOOOOXXO XOOOOXXX XOOOXOOO XOOOXOOX XOOOXOXO XOOOXOXX XOOOXXOO XOOOXXOX XOOOXXXO XOOOXXXX XOOXOOOO XOOXOOOX XOOXOOXO XOOXOOXX XOOXOXOO XOOXOXOX XOO...

Отзывы: