Siemens HCP Скачать руководство пользователя страница 12

Siemens Industry, Inc.
Building Technologies  Division
Florham Park, NJ

Siemens Canada, Ltd.
1577 North Service Road East
Oakville, Ontario
L6H 0H6 Canada

P/N 315-034860-13

Document ID A6V10233196

Cyber security disclaimer

Siemens products and solutions provide security functions to ensure the secure operation of
building comfort, fire safety, security management and physical security systems. The security
functions on these products and solutions are important components of a comprehensive security
concept.

It is, however, necessary to implement and maintain a comprehensive, state-of-the-art security
concept that is customized to individual security needs. Such a security concept may result in
additional site-specific preventive action to ensure that the building comfort, fire safety, security
management or physical security system for your site are operated in a secure manner. These
measures may include, but are not limited to, separating networks, physically protecting system
components, user awareness programs, defense in depth, etc

.

For additional information on building technology security and our offerings, contact your Siemens
sales or project department. We strongly recommend customers to follow our security advisories,
which provide information on the latest security threats, patches and other mitigation measures.

 

http://www.siemens.com/cert/en/cert-security-advisories.htm

Содержание HCP

Страница 1: ... module The HCP may only be assigned addresses 1 to 60 It is recommended to program the HCP devices first to ensure that enough addresses have been reserved for them Other devices may then be assigned to addresses in this range that were not assigned to an HCP Disconnect wire at terminal 1 and 2 on TB1 before programming To set the HCP device address Plug the programming cable of the DPU Programme...

Страница 2: ...er XLS FS 250 Desigo FC2025 2050 FV2025 2050 Cerberus PRO FC922 924 FV922 924 Systems through its addressable device loops These loops are connected to the DLC via terminal blocks on the CC 5 or CC 2 cardcage XLS or to the FS DLC viaTB3 on the FS MB FS MB2 main board FS 250 They may be wired Class A Style 6 or Class B Style 4 Figure 2 shows both wiring types and the connections to the DLC See the ...

Страница 3: ... HCP TB1 1 2 HCP TB1 1 2 ZONE 1 ZONE 2 DLC LOCATED IN ONE SLOT OF CC 5 CC 2 HCP TB1 1 2 HCP TB1 1 2 4 3 2 1 CLASS A WIRING CLASS B WIRING HCP TB1 1 2 HCP TB1 1 2 HCP TB1 1 2 HCP TB1 1 2 1 1 2 2 X1401 X1402 X1801 X1802 4 3 2 1 1 1 2 2 Detector circuits on periphery board for FC922 FV922 FC2025 FV2025 X1401 X1402 X1801 X1802 Figure 2 FireFinder XLS Device Loop Connections NOTES 1 Loop resistance 50 ...

Страница 4: ... FireFinder XLS FS 250 System control panel the Desigo FC2025 2050 FV2025 2050 Operating Unit and the Cerberus PRO FC922 924 FV922 924 Operating Unit For FS 250 Systems the NAC circuit must be set to always on in the panel or FS CT2 configuration tool See the Line Resistance table below for the allowable line resistance for each HCP output circuit E C N A T S I S E R E N I L T I U C R I C T U P T ...

Страница 5: ...XLS System only as shown in Figure 5 the 24 VDC provides power to the supervision and call in detection circuitry If the 24 VDC is lost a trouble condition displays on the PMI PMI 2 of the FireFinder XLS The HCP provides a dial tone when a Fireman s Master telephone FMT is taken off hook or when a Portable FireFighter s telephone PFT is jacked in Each HCP can support a maximum of 5 phones off hook...

Страница 6: ...RAMMING POINTS PROGRAMMING POINTS REFER TO PAD 4 INSTALLATION INSTRUCTIONS P N 315 050217 FOR PROPER SETTING OF SWITCH 4 THE AUXILIARY POWER OUTPUT MUST BE CONFIGURED TO ALWAYS ON Figure 6 HCP Used As A Telephone Zone HCP As 70 7V 25V Speaker Zone in an XLSV System When the HCP is used as a speaker zone FireFinder XLS System only the 24 VDC provides power to the supervision circuitry If the 24 vol...

Страница 7: ...ker zone wire length for various wire gauge sizes is shown in Figure 7 for the 70 7V option and in Figure 8 for the 25V option Connect the speaker output as Style Z Class A or StyleY Class B as shown in Figures 10 and 11 100 0 0 05 0 10 0 15 0 20 0 25 200 300 400 500 600 TOTAL SPEAKER ZONE WIRE LENGTH FEET dB LOSS 700 800 900 1000 SPEAKER LOAD 25 WATTS AT 70 7V RMS LOCATED AT END OF RUN DOES NOT I...

Страница 8: ...IO OUTPUT 70 7 25 VRMS 40 WATTS MAX POWER LIMITED STYLE Z SUPERVISED SPEAKER ZONE CONNECTIONS SUPV 14 VDC 1mA ACTIVATED 70 7 V 25V RMS 25 WATTS MAX 24K W 5 EOL RESISTOR P N 140 034677 EARTH SHIELD HCP STYLE Y SUPERVISED SPEAKER ZONE CONNECTIONS SUPV 14 VDC 1mA ACTIVATED 70 7 V 25V RMS 25 WATTS MAX CAPACITOR COUPLED 70 7V 25V RMS SPEAKERS 24K W 5 EOL RESISTOR P N 140 034677 EARTH SHIELD HCP 24K W 5...

Страница 9: ...TS MAX POWER LIMITED STYLE Z SUPERVISED SPEAKER ZONE CONNECTIONS SUPV 14 VDC 1mA ACTIVATED 70 7 V 25V RMS 25 WATTS MAX 24K W 5 EOL RESISTOR P N 140 034677 EARTH SHIELD HCP STYLE Y SUPERVISED SPEAKER ZONE CONNECTIONS SUPV 14 VDC 1mA ACTIVATED 70 7 V 25V RMS 25 WATTS MAX CAPACITOR COUPLED 70 7V 25V RMS SPEAKERS 24K W 5 EOL RESISTOR P N 140 034677 EARTH SHIELD HCP 24K W 5 EOL RESISTOR P N 140 034677 ...

Страница 10: ...ISED SPEAKER ZONE CONNECTIONS SUPV 14 VDC 1mA ACTIVATED 70 7 V 25V RMS 25 WATTS MAX 24K W 5 EOL RESISTOR P N 140 034677 EARTH SHIELD HCP STYLE Y SUPERVISED SPEAKER ZONE CONNECTIONS SUPV 14 VDC 1mA ACTIVATED 70 7 V 25V RMS 25 WATTS MAX CAPACITOR COUPLED 70 7V 25V RMS SPEAKERS 24K W 5 EOL RESISTOR P N 140 034677 EARTH SHIELD HCP 24K W 5 EOL RESISTOR P N 140 034677 68K 1 4W 5 EOL RESISTOR ON LAST HCP...

Страница 11: ...h deep plaster ring extension 2 Connect the field wiring 3 Insert the HCP into the box and fasten the device plate to the box 4 Cover the device front plate with the 5 inch switchplate supplied and fasten with two plate screws 4 INCH SQUARE BOX 2 1 8 INCHES DEEP DOUBLE GANG BOX 3 1 2 INCHES DEEP HCP HCP SWITCHPLATE 5 INCHES SQUARE SUPPLIED SWITCHPLATE 5 INCHES SQUARE SUPPLIED 1 1 2 INCH DEEP EXTEN...

Страница 12: ...security concept that is customized to individual security needs Such a security concept may result in additional site specific preventive action to ensure that the building comfort fire safety security management or physical security system for your site are operated in a secure manner These measures may include but are not limited to separating networks physically protecting system components us...

Отзывы: