
Diagnostics and upkeep
6.3 Module replacement
CP 1243-7 LTE
Operating Instructions, 01/2015, C79000-G8976-C381-01
111
6.3
Module replacement
Module replacement
WARNING
Read the system manual "S7-1200 Programmable Controller"
Prior to installation, connecting up and commissioning, read the relevant sections in the
system manual "S7-1200 Programmable Controller" (refer to the documentation in the
Appendix).
When installing and connecting up, keep to the procedures described in the system manual
"S7-1200 Programmable Controller".
Make sure that the power supply is turned off when installing/uninstalling the devices.
The STEP 7 project data of the CP is stored on the local CPU. If there is a fault on the
device, this allows simple replacement of this communications module without needing to
load the project data to the station again.
When the station starts up again, the new CP reads the project data from the CPU.
If you replace a module, remember to take the SIM card from the old module and insert it in
the new CP.
Содержание CP 1243-7 LTE-EU
Страница 10: ...Table of contents CP 1243 7 LTE 10 Operating Instructions 01 2015 C79000 G8976 C381 01 ...
Страница 112: ...Diagnostics and upkeep 6 3 Module replacement CP 1243 7 LTE 112 Operating Instructions 01 2015 C79000 G8976 C381 01 ...
Страница 128: ...Accessories C 2 TS Gateway CP 1243 7 LTE 128 Operating Instructions 01 2015 C79000 G8976 C381 01 ...