I
Siemens Building Technologies
Cerberus Division
12.2000
About this document ..........................................................................................1
NW8005 Data Line Test Set .....................................................2
SLK-12 Line test set W&G..........................................................................3
2.2.1 Interference when operating on mains supply............................................6
Installation / Commissioning...................................................................7
Fitting alkaline batteries or re-chargeable batteries....................................7
3.2.1 Recharging batteries / mains operation......................................................8
Functions and configurations ...............................................................10
SLT configuration and transfer software...................................................10
Preparations prior to field application .......................................................11
Automatic measurement...........................................................................15
Components / Spare parts .....................................................................18
Disposal / Protection of the environment ............................................18