14
Siemens Building Technologies
Cerberus Division
e3180a.doc
12.2000
5.1.4
Erasing the result memory
➜
Press keys simultaneously for longer than 1 sec.
➜
Press key once again for confirmation
5.2
Preparations in the field
1.
The data line must not be live.
2.
All bus nodes must be removed from the data line. No electronic components must
be connected to the data bus.
3.
The individual segments of the data link must be interconnected.
4.
The SLT-22 device is connected to terminals "Pair1" near end.
5.
The SLT-11 device is connected to terminals "Pair1" far end.
5.2.1
Commissioning of the test set
Connect test specimen
The devices are connected using the safety cables and safety clips supplied. Terminals
Pair1
are used on both devices.
The SLT-22 device is used as actuating device (Master) at the near end and the SLT-
11 device (Slave) at the far end.