PROFIBUS MODULE (CB15/CB155)
English
Operating Instructions
6
2. INSTALLATION
Incorrect operation of the serial bus system can lead to an inverter being switched on inadvertently.
Commissioning work must only be carried out by personnel who are qualified in installing such
systems. Additionally, the guidelines associated with the installation of the inverter itself must be
followed (see section 2 of the inverter’s handbook).
WARNING
2.1 Installing the Module
The inverter must be switched off before the CB15/155 is either connected or disconnected. The CB15/CB155 is
powered directly from the inverter and therefore needs no additional external supply
2.1.1 CB15 Installation
Fix the CB15 to the front of the inverter by mating the D-type connectors together and then securing in position by
pressing the module onto the inverter.
2.1.2 CB155 Installation
Before connecting the CB155 to the inverter, it is necessary to set the following parameters to the correct values,
using the OPM2.
Fix the CB155 to the side of the inverter housing using the screws provided. Connect the CB155 to SK200 on the
inverter, using the supplied cable.