2000585-001
Installation
••••
15
Chapter 2
Installation
Overview
This chapter is intended for installation personnel. After completing the
procedures in this chapter the Advance DataNET Hub (DNH) will be
ready for operation. To ensure a safe and trouble free installation, follow
all procedures and associated advisory information.
Ensure that all AC Power (Mains) Specification requirements and adviso-
ries are met. Failure to do so, and operating the equipment in a manner
not specified, may impair the safety protection provided by the equip-
ment.
Before beginning the installation process read through this Chapter to
familiarize yourself with the installations requirements. This will aid you to
ensure a safe and trouble free installation.
Topic
See Page
Unpacking and Inspection
16
Wall or Rack Mounting Installation
17
Site Wiring Requirements
19
CE Installations
23
Wiring Connections
25
AC Power (Mains) Connections
26
DataNET Copper Connections
29
DataNET Hub Signal Equalizer Board
34
Hub Signal Equalizer Board with Generic Cable
37
DataNET Fiber Optic Connections
42
Ethernet Connections
45
Introduction
WARNING
Installation Overview
Содержание Advance DataNET
Страница 22: ......
Страница 52: ......
Страница 96: ......
Страница 97: ...Siemens Applied Automation 500 West Highway 60 Bartlesville OK 74003 Phone 918 662 7000 Fax 918 662 7052 ...