12
2.
Installation
2.1
Transport Units
The panel should not be lifted from the top with circuit
breaker inside.
2.2
Packing
2.3
Unloading
2.3.1
Handling equipment required
transport unit.
– Lifting tackle
– Pallet truck of 3 mtr length or two pallet trucks of smaller
2.3.2
Procedure
– Use of mobile crane..
the lifting tackle.
2.4
Examining the switchgear against damage
2.4.1
Storage
– The packing cases must be stored indoor such that
such natural elements
2.5
Transferring the transport units to their points
of installation
clearance of about 25 mm between them.
2.5.1
Removing the Truck from the Panel
clause 4.1.3.1)
2.6
Assembling the Switchboard
2.6.2.
2.6.1
Joining of the Panels
Содержание 8BK80
Страница 8: ......