
Table 9-2
Control Module: Checklist for preventive maintenance work
Maintenance
Carried out by:
Frequency
Comments
Replace the UPS battery.
Owner
Siemens
service per‐
sonnel
When the relevant
message is output.
Relevant for option L53
Check the software.
Siemens
service per‐
sonnel
After every parameter
modification, and ev‐
ery five years there‐
after
Test the insulation.
Siemens
service per‐
sonnel
Every two years
"Bender insulation" test mode
9.4.3
Visual inspections
9.4.3.1
Equipment for visual inspections
You require the following basic equipment to carry out the visual checks and maintenance work:
● Mirror
● Flashlight
● Torque wrench for tightening screws
Damage due to contamination and dirt
Contamination and dirt can damage the device.
● Visually inspect the equipment at least once per year. For more information, please refer to
the section "Visual inspections".
● Dust deposits inside the cabinet unit must be removed at regular intervals (or at least once
a year) by qualified personnel in line with the relevant safety regulations.
Note
The actual intervals at which maintenance procedures are to be performed depend on the
environmental and operating conditions. Define maintenance intervals that reflect your plant-
specific environmental and operating conditions and meet your availability requirements. When
doing so, take the prescribed maintenance intervals into consideration, as well as the
instructions for repairing and replacing installed components.
9.4.3.2
Checking the isolating clearances
● Slight, dry, non-conducting contamination is permitted.
● Remove contamination caused by dust in conjunction with high humidity.
Maintenance
9.4 Preventive maintenance
SINAMICS PERFECT HARMONY GH150 6SL3825
96
Operating Instructions 05/2020
Содержание 6SL3825
Страница 2: ...19 06 2020 09 58 V14 00 ...
Страница 12: ...Table of contents SINAMICS PERFECT HARMONY GH150 6SL3825 12 Operating Instructions 05 2020 ...
Страница 128: ...Maintenance 9 7 Repair SINAMICS PERFECT HARMONY GH150 6SL3825 128 Operating Instructions 05 2020 ...
Страница 130: ...Spare parts SINAMICS PERFECT HARMONY GH150 6SL3825 130 Operating Instructions 05 2020 ...
Страница 134: ...Service Support SINAMICS PERFECT HARMONY GH150 6SL3825 134 Operating Instructions 05 2020 ...
Страница 140: ...Quality documents SINAMICS PERFECT HARMONY GH150 6SL3825 140 Operating Instructions 05 2020 ...
Страница 142: ...Additional documents SINAMICS PERFECT HARMONY GH150 6SL3825 142 Operating Instructions 05 2020 ...
Страница 145: ......
Страница 146: ...Further Information www siemens com LDA Siemens AG Large Drives Applications Vogelweiherstr 1 15 90441 NÜRNBERG GERMANY ...