Procedure
Connect the PROFIBUS DP as follows:
1. Plug the bus connector into the PROFIBUS connection.
2. Tighten the fixing screws of the bus connector.
Additional information
All the information required for handling bus cables and connectors can be found in Manual
ET 200 Distributed I/O System (
http://support.automation.siemens.com/WW/view/en/
6.6
Connecting FOUNDATION Fieldbus on Compact FF Link
Important information
The following content is binding for installation of the FOUNDATION Fieldbus:
● FOUNDATION Fieldbus Application Guide, 31.25 Kbit/s Intrinsically Safe Systems,
AG‑163, Revision 2.0
● Wiring and Installation 31.25 Kbit/s, Voltage, Mode, Wire Medium, AG‑140, Revision 1.0
● FOUNDATION Fieldbus System Engineering Guidelines, AG‑181, Revision 2.0
More information is available on the Internet at:
http://www.fieldbus.org
● Installation regulations in accordance with IEC 60079‑14 (Electrical equipment in potentially
explosive atmospheres)
Tools required
You need a suitable screwdriver to wire the FOUNDATION Fieldbus.
Bus cable
See section Article numbers (Page 89).
Connecting
6.6 Connecting FOUNDATION Fieldbus on Compact FF Link
Compact FF Link
Operating Instructions, 03/2015, A5E35651552-AA
39