Infrastructure and Mobility, Traffic Solutions
Sopers Lane, Poole, Dorset
BH17 7ER
Version
7
Page 44 of 76
Status
ISSUED
Last Editor
Ore Oluwatudimu
TS008468
Date
31/01/2017
Document
Name
UPS Solution General Handbook
Doc. No.
667/HB/47750/000
Copyright
Siemens plc 2017 All Rights Reserved
8.
Switch the
Manual Bypass Switch
(SW1) on the UATS to
UPS
.
9.
Check that the green STATUS LED on the Alpha FXM UPS unit is solidly
illuminated.
10.
Check that the red ALARM LED on the Alpha FXM UPS unit is not lit or flashing.
11.
Note down the model name from the bottom left of the display (e.g. ‘FXM 2000’)
12.
Note down the at-a-glance settings from the top right of the display (e.g.
‘230/50/N’).
The UPS Solution is now switched on and supporting the traffic Intersection. Mains power
from the site supply feeder pillar is now fed through the UPS unit before being passed on
to the controller.
11.6 Testing the UPS Battery Support Function
NOTE:
Enter all results into APPENDIX D – UPS Commissioning Certificate
1.
Switch the
Mains Input MCB
on the UPS Housing to
OFF
.
2.
Ensure the UPS unit now displays ‘INVERTER’ and that traffic intersection is still
fully operational.
3.
Check that the green STATUS LED on the Alpha FXM UPS unit is now flashing.
4.
Switch the
Mains Input MCB
on the UPS Housing to
ON
.
5.
Wait for the UPS unit to display ‘LINE’.
6.
Ensure the traffic intersection is still fully operational.
7.
Check that the green STATUS LED is now solidly illuminated.
8.
Check that the red ALARM LED is not lit or flashing
Commissioning of the UPS Solution is now complete.