D. To mount the device perform the following steps:

1. For individual enclosures, panelboards and

switchboards manufactured by Siemens
Energy & Automation, Inc., follow the
instructions provided with this equipment.

2. For those applications where mounting is on

a flat surface of the customers equipment, drill
and top mounting bolt holes according to the
drilling plan in Fig. 2.  For escutcheon cut out
plans refer to Fig. 3.

3. If device contains internal accessories, make

sure terminals can be connected when the
circuit breaker is mounted.

Fig. 3

Fig. 2

9.75

4.40

6.86

OF HANDLE
ESCUTCHEON

OF HANDLE
ESCUTCHEON

DRILL AND TAP
1/4-20 HOLE
(4 OR 6 PLS.)

REQUIRED FOR
SCJD6/SCLD6
ONLY

OF HANDLE
ESCUTCHEON
(SEE FIG. 2)

OF HANDLE
ESCUTCHEON
(SEE FIG. 2)

1.50

3.00

1.25

2.50

3.07

1.50

2.00

3.25

6.50

4. Remove the line and load terminal shields

(see Fig. 4) by loosening the shield screws
that attach them to the circuit breaker.

5. Position the circuit breaker on the mounting

surfaces, install the mounting hardware and
tighten securely.

6. After mounting the circuit breaker, the line and

load terminal accessory terminals should be
connected.

7. After the circuit breaker is installed, check all

mounting hardware for secureness.  Check
wire connectors for correct torque requirements.
Torque values for line and load connectors are
provided on the circuit breaker nameplate.

Содержание 411625A00

Страница 1: ... for use in individual enclosures panelboards switchboards or other approved equipment The installation procedure consists of inspecting attaching required accessories mounting the circuit breaker and connecting and torquing the line and load wire connectors Mounting hardware and unmounted wire connectors where required are available as separate catalog items A Turn off and lock out all power befo...

Страница 2: ...lans refer to Fig 3 3 If device contains internal accessories make sure terminals can be connected when the circuit breaker is mounted Fig 3 Fig 2 9 75 4 40 6 86 OF HANDLE ESCUTCHEON OF HANDLE ESCUTCHEON DRILL AND TAP 1 4 20 HOLE 4 OR 6 PLS REQUIRED FOR SCJD6 SCLD6 ONLY OF HANDLE ESCUTCHEON SEE FIG 2 OF HANDLE ESCUTCHEON SEE FIG 2 1 50 3 00 1 25 2 50 3 07 1 50 2 00 3 25 6 50 4 Remove the line and ...

Страница 3: ...Manual operation of the circuit breaker is controlled by the circuit breaker handle and the PUSH TO TRIP button The circuit breaker handle has three indicating positions two of which are molded into the handle to indicate ON and OFF The third position indicates a TRIP position and is between the ON and OFF positions See Fig 4 A Circuit Breaker Reset After tripping the circuit breaker is reset by m...

Страница 4: ...tting lr is a percentage of the Maximum Continuous Current rating ln Two long time delay settings are available These are delay times of 3 seconds or 25 seconds at 6 times the Continuous Current Setting lr These are selected by using the appropriate area of the setting See Figure 5 Instantaneous Pickup All models have an Instantaneous Pickup adjustment This adjustment sets the Instantaneous Pickup...