Siemens Energy & Automation, Inc.
Bellefontaine, OH 43311 U.S.A.
Installation Instructions
Hazardous voltage.
Will cause death or
severe injury.
Turn off and lock out all power
supplying this device before
removing cover(s) or device and
while cover(s) are removed.
Replace all covers and shields
before power supplying this
device is turned on.
Page
2 of 4
D. To mount the device perform the following steps:
1. For individual enclosures, panelboards and
switchboards manufactured by Siemens
Energy & Automation, Inc., follow the
instructions provided with this equipment.
2. For those applications where mounting is on
a flat surface of the customers equipment, drill
and top mounting bolt holes according to the
drilling plan in Fig. 2. For escutcheon cut out
plans refer to Fig. 3.
3. If device contains internal accessories, make
sure terminals can be connected when the
circuit breaker is mounted.
Fig. 3
Fig. 2
9.75
4.40
6.86
OF HANDLE
ESCUTCHEON
OF HANDLE
ESCUTCHEON
DRILL AND TAP
1/4-20 HOLE
(4 OR 6 PLS.)
REQUIRED FOR
SCJD6/SCLD6
ONLY
OF HANDLE
ESCUTCHEON
(SEE FIG. 2)
OF HANDLE
ESCUTCHEON
(SEE FIG. 2)
1.50
3.00
1.25
2.50
3.07
1.50
2.00
3.25
6.50
4. Remove the line and load terminal shields
(see Fig. 4) by loosening the shield screws
that attach them to the circuit breaker.
5. Position the circuit breaker on the mounting
surfaces, install the mounting hardware and
tighten securely.
6. After mounting the circuit breaker, the line and
load terminal accessory terminals should be
connected.
7. After the circuit breaker is installed, check all
mounting hardware for secureness. Check
wire connectors for correct torque requirements.
Torque values for line and load connectors are
provided on the circuit breaker nameplate.