Transport, storage and packing
9229 9860 176 0E
9
2013-08-22
•
Set the vacuum circuit-breaker down onto the square timbers.
•
Hang further sling gear into the transport boreholes.
•
Transport to installation site or leave suspended from crane for further work
steps.
Fig. 8
Positioning the square timbers and setting
down the vacuum circuit-breaker
Fig. 9
Transporting without pallet
Siemens Parts
Содержание 3AH3
Страница 4: ...4 9229 9860 176 0E 2013 08 22 Blank page ...
Страница 16: ...Transport storage and packing 16 9229 9860 176 0E 2013 08 22 Blank page ...
Страница 52: ...Operation 52 9229 9860 176 0E 2013 08 22 Blank page ...
Страница 58: ...Maintenance 58 9229 9860 176 0E 2013 08 22 Blank page ...
Страница 60: ...Index of keywords 60 9229 9860 176 0E 2013 08 22 Blank page ...
Страница 62: ...62 9229 9860 176 0E 2013 08 22 Blank page ...
Страница 63: ...9229 9860 176 0E 63 2013 08 22 Blank page Siemens Parts ...