• Regular annual maintenance should be carried out to ensure that all movable components
are functioning correctly and are lubricated with non-corroding and non-resinous grease.
• Never use cleaning agents that are aggressive or contain solvents, as these may damage
the surface of the components.
• Both the contractor and the user must be trained in the operation and maintenance of the
multi-point lock.
1.5
Installation conditions and requirements
• Local building laws and regulations must be observed before and during door installation
in addition to the following requirements and conditions:
• Observe the milling dimensions
• Position the frame parts according to the specifications, observing the horizontal and
vertical adjustment accurately.
• Before installing the multi-point lock, check the dimensional accuracy of the door and
the door frame. The multi-point lock must not be installed if the door and/or the frame is
warped and/or damaged.
• Install the multi-point lock and accessories according to our assembly instructions. Use the
clamp included in the delivery supplied for assembly.
• Remove any splinters from the lock mortise after milling.
• Once the lock is installed, do not perform mechanical work on the door (such as drilling or
milling). Do not drill into or through the main lock under any circumstances.
• Observe the specified positions and sizes when drilling the holes.
• Follow the hardware manufacturer's instructions when drilling the holes for the operating
handle/hardware.
• Install hardware components and cylinder flush without overtightening the screws or
screwing them in at an angle.
• Fasten handle set by hand only and do not use force when installing the spindle.
• Keep the distance between the secondary sash and frame parts:
For 1-leaf doors: 2 to 6 mm
For 2-leaf doors: 4 to 6 mm
• Operating elements should not impede each other.
• Check that any existing block setting is packed correctly.
• Surface treatment of the door and door frame must take place before the multi-point lock
is installed. A subsequent surface treatment can reduce the functional capacity of the
multi-point lock.
• Use only acid-free neutral-cure sealants to prevent corrosion of components and/or the door.
1.5.4
Dimensions
All measurements are given in mm.
Содержание KFV AS3500
Страница 2: ......
Страница 11: ...Installation 11 04 2016 KFV 2 3 Repositioning the latch optional 1 2 3 4...
Страница 15: ...2 6 Screwing on the multi point lock 9x Installation 15 04 2016 KFV...
Страница 16: ...2 7 Cutting the door frame Installation All dimensions are in mm 16 KFV...
Страница 18: ...2 9 Screwing in the frame parts max 5 mm max 5 mm Installation 18 04 2016 KFV...
Страница 19: ...2 10 Adjusting the frame parts 1 2 3 Installation 19 04 2016 KFV...
Страница 26: ...Appendix 26 04 2016 KFV...
Страница 27: ......