background image

The chimney  height  will be determined  by the 
surrounding  roof  & trees.   The chimney  should 
extend  at least  24” above  the high point  of the 
roof with no obstructions  from nearby  roofs, 
trees or other  structures.

24”

Trim or remove  any  nearby  trees  that 
would  interfere  with chimney  draft

The vent  pipe  should  extend  only  to 
(and not beyond)  the inside  wall of the 
chimney.   Cement  vent  pipe  tightly  into 
chimney  opening.

THIMBLE

Gas fired units will require  less draft than  coal 
fired, however,  a chimney  flue with adequate 
draft and capacity  is required.   An A.G.A. draft 
diverter  must be installed  on all gas-fired 
heating  units.

DRAFT 

DIVERTER

12” 

EXTENSION 

(RH360)

UNION

TEE

DIRECTION OF FLOW

PIPE CAP

FLOOR LEVEL

3” MIN

Location  of union  and drip leg  for connecting 
conversion  burner  to house  piping

CONTROL MANIFOLD

MANUAL SHUTOFF 

VALVE

” N.P.T. PLUGGED TAPPING 
PRESSURE GAUGE PORT

ROYAL

Heaters

20 ft.

10 ft.

I

I

240

360

RH360 Requires 

9” Ø Stack

RH240 Requires 

8” Ø Stack

RH360 Requires 

a 12” Extension 

between  furnace 

and draft diverter

General Information & Instructions

-Unit crated weights: 240 = 640 lbs. / 360 = 780 lbs.

-Always use double wall pipe on gas units.

-Never have less than .02 - .04 inches of draft in the chimney.

-Always use black metal piping for gas (Nat./L.P.) installations.

-Rule of thumb for chimneys = 2’ vertical for every 1’ horizontal. 

-Always check with the gas company on appropriate pipe sizing.

-Always check with the gas company to ensure adequate fuel supply.

-Never reduce the size of chimney from the furnace to the draft cap.

-Never run exhaust fans in any building while furnaces are in operation.

-Always vent gas fumes.  Gas fumes not vented can cause death to plants, animals and humans.

-The draft diverter must always be installed VERTICALLY unless otherwise stated by Siebring Mfg.          
Warranty will be void if venting does not meet local codes for gas venting.

6

Draft Cap

Содержание ROYAL HEAT 240

Страница 1: ...ww siebringmfg com Email sales siebringmfg com ROYAL HEAT 240 360 GAS FURNACE ROYAL HEAT 240 360 GAS FURNACE ROYAL HEAT 240 360 GAS FURNACE ROYAL HEAT 240 360 GAS FURNACE INSTRUCTIONS INSTRUCTIONS INS...

Страница 2: ......

Страница 3: ...Square D electrical box 17 Electrical Diagram 18 Troubleshooting 19 Troubleshooting continued 20 Troubleshooting continued 21 Troubleshooting continued 22 Parts List 23 Parts Diagram Furnace 24 Parts...

Страница 4: ...uch equipment Overnight Next Day or any shipping method other than UPS Ground will be the responsibility of the customer This warranty shall not apply to any equipment which shall have been repaired o...

Страница 5: ...S 4 DO NOT TRY TO LIGHT THE FURNACE 5 IMMEDIATELY CALL YOUR GAS SUPPLIER WARNING Improper installation adjustment alteration service or maintenance can cause property damage injury or death Read the i...

Страница 6: ...a must be provided 7 In greenhouses this unit may be positioned on four 4 concrete block or bricks 8 In garages this unit should be suspended with at least 7 of clearance under the furnace In garages...

Страница 7: ...P T PLUGGED TAPPING PRESSURE GAUGE PORT ROYAL Heaters 20 ft 10 ft I I 240 360 RH360 Requires 9 Stack RH240 Requires 8 Stack RH360 Requires a 12 Extension between furnace and draft diverter General In...

Страница 8: ...originally supplied are replaced they should be replaced with type T wires with a 63 F 35 C rise wire in similar colors 2 Follow all local codes when wiring this furnace 3 This furnace must be electr...

Страница 9: ...bricks setting directly on the ground A variety of openings can be supplied on these furnaces 3 The furnaces require A 12 distance to any combustible material See General Info for exceptions B 12 of...

Страница 10: ...h end of the greenhouse One heat unit for two houses is not recommended Inter House Heating Air forced under bench through poly tubing duct Air forced under bench Bench covered with used poly Heated A...

Страница 11: ...e to lock the gas valve out Heating will cease GENERAL RULES 1 Do not reduce the stack size anywhere in the entire vent system 2 The stack must not be closer than 12 to any combustible material 3 All...

Страница 12: ...er drainage and chimney cleaning Install a cap on the bottom of the Tee V Vertical Chimney Height must be at least twice as long as H H Horizontal Pipe must slope upwards away from furnace per foot of...

Страница 13: ...pening and thru the fresh air inlet Remove the burner tray The burner manifold and nozzles may be brushed off and cleaned with compressed air Any blocked nozzles may be opened by pushing a soft wire t...

Страница 14: ...13...

Страница 15: ...14...

Страница 16: ...ese valves The gas valve has an adjustable pressure regulator The largest screw on the top of the gas valve must be removed to gain access to the adjustment screw Turn clock wise to increase the flow...

Страница 17: ...SQUARE D BREAKER BOX RH360 25 Ground Lug Neutral L1 Line In Common To Blower Motor To Transformer To Fan Limit Switch Connect to 120 VAC 60 HZ 25A Service 16...

Страница 18: ...or CB Transformer 120V to 24V To Blue Bird switch Royal Heat Gas 240 360 To Thermostat To Terminal block To Blue Bird switch Gas Valve Robert Shaw 700 406 17 200 Snap Disc 180 Snap Disc Connect to 120...

Страница 19: ...all blower inlet guards increase outlet restriction on furnace 2 Blower motor does not start A Reset button or auto reset device on motor Push in to reset manual Allow motor to cool reset will be auto...

Страница 20: ...immediately A Inadequate pilot gas flow Clean orifice with compressed air increase pilot gas flow CCW B Bad thermocouple corroded connection to gas valve Replace clean check tighten connections on gas...

Страница 21: ...acity C Supply piping too small Increase pipe size D Wrong gas type Check gas type replace orifices pilot E Bad gas valve Replace by qualified technician F Poor gas quality Connect to good gas supply...

Страница 22: ...170 B Defective fan limit switch Replace C Furnace is not at full firing rate See main burner section 11 Discharge air too hot too cold A Check firing rate Check gas pressures orifice size B Improper...

Страница 23: ...farm duty or manual reset model 11 Drive motor Pulley RH240 4 RH360 3 12 Motor Mount Bracket RH240 Small RH360 Large 13 Drive Belt RH240 47 RH360 49 14 Driven blower Pulley 9 15 Blower RH240 Small La...

Страница 24: ...23 Parts may not be drawn to scale 2 5 A RH240 RH360 Parts 2 3 13 12 11 10 9 1 4 8 7 6 5 18 17 16 15 14 Not Shown...

Страница 25: ...18 19 20 21 22 Top View 23 Side View 21 25 27 24 26 27 28 28 24 Pilot Thermocouple...

Страница 26: ...ll units in the facility are in operation Use a minimum of 1 I D flex gas pipe or 1 I D gas rated flexible hose long enough to allow for burner tray removal approximately 6 feet This will facilitate l...

Страница 27: ...f you don t smell gas turn on the gas supply to the H17 pilot valve smaller L P valve 5 Depress the reset button on the H17 pilot valve and hold 6 Light pilot Continue to depress reset button for 30 4...

Страница 28: ...0 3 51 3 30 18 22 22 Side View Blower Safety Screens Blower Royal Heat 360 Chimney 9 Vent Flange 24 Burner Tray 48 57 Motor 24 Burner Tray 4 18 Crated size 62L x 43W x 64H Approximate shipping weight...

Страница 29: ...6 28 34 12 12 12 12 DO NOT locate this unit closer than 12 to any combustible material this includes the chimney blower all 4 sides and the top of the unit Allow approximately 36 for tray removal 28...

Отзывы: