12
5630
6
2019
-
SX35 & SX50
MG_0112
Align two ends of the tunnel.
Push two tunnel
ends together.
Check snap lock
positions around the
tunnel.
Ensure top lips tabs
into the motor
inserts.
1
2
Tunnel Installation
EN
1. Ensure grids or cowls are installed if in use.
2. Connect both ends of the tunnel to the thruster motor. All hooks must be completely interlocked making the inside of the tunnel smooth.
(NB:
Ensure tunnel moulding around the gear leg and tunnel top align.)
MC_0074
!
Please refer to the graphic for special considerations relating to your model
!
IMPORTANT
Ensure all snap-lock positions are correctly connected into place.
Содержание SX-35/140
Страница 22: ...22 5630 6 2019 SX35 SX50 MC_0037 Notes EN ...
Страница 23: ...23 5630 6 2019 SX35 SX50 MC_0037 Notes EN ...