11
SE120/215T Ignition Protected thruster assembly
version 1.6 2015
32
SP 75 Ti / SP 95 Ti / SP 125 Ti
2.5.1- 2007
Schaltplan - Übersicht
"Visual" wiring diagram
GB
D
Schema di connessione visivo
I
Schéma visuel de branchement
F
Visualinen kytkentäkaava
FI
Koblingsskjema elektrisk
N
A2
A
1
Fu
se
9
6
8
1
2
45
red gr
ey
bl
ue
bl
ac
k
gre
y
blu
e
br
ow
n
red
6 12
32i
El
ectr
on
ic
contr
ol bo
x
Th
erm
al
swit
ch
B
at
te
ry
12V or 24V
B
at
ter
y
m
ai
n
sw
itc
h
M
4 3 2 1
3
red
red
bl
ac
k
7
white
NB!
Make sure to not use
any electronic interface
box (delay box) older than
the 6 1232i (ex. 6 122x)
on SP75Ti, SP95Ti, and
SP125Ti.
NB!
Make sure to not use
any electronic interface
box (delay box) older than
the 6 1232i (ex. 6 122x)
NB! Very important to check the following with mainswitch
in off position:
After all electrical connections have been completed check with an
ohm meter that there is no electrical connection between electro-
motor body and positive terminal on the motor and between the
electromotor body and the negative (A1) terminal on the motor.
If you feel unsure on how to perform this check, contact skilled
personnel for guidance.
"Visual" wiring diagram
EN