8
SE 40/125S ignition protected thruster assembly
version 1.3 - April 2014
1. Remove the 2 bolts in the motorbracket (Fig 1).
2. Use the enclosed template to measure that the driveshaft has come through the motorbracket with the correct height (Fig 2).
3. Place the motor assembly gently on the motorbracket. Make sure that the drive pin in motor drive shaft fits the into the
corresponding grove in the gearleg shaft. Be careful, the motor is heavy!
4. Fasten the motor assembly to the bracket with the 4 bolts and cross tighten them first with 15Nm (11lb/ft) and then with 33Nm
(24lb/ft).
NB !
Paint the gear leg and propeller with antifouling for propellers to prevent growth of barnacles or similar which would reduce the
performance dramatically. Do not paint the propeller shaft, the anodes or the end face of the gearhouse.
NB ! Do not run the thruster for more than very short bursts without being in the water.
Fitting the electromotor IP assembly
Fig. 1
Fig. 2
1
1
2
2
3
3
4
4
5
5
6
6
A
A
B
B
C
C
D
D
13.09.2011
1
Designed by
Date
1 / 1
Edition
Sheet
R. Hansen
Material Type
Drawing nr
SM-101539
Copyright All rights reserved
Part nr
Size
Scale
Title
Tolerance
NS-ISO 2768-1
SLEIPNER MOTOR AS
A3
N/A
Weight
1
1
2
2
3
3
4
4
5
5
6
6
A
A
B
B
C
C
D
D
13.09.2011
1
Designed by
Date
1 / 1
Edition
Sheet
R. Hansen
Material Type
Drawing nr
SM-101539
Copyright All rights reserved
Part nr
Size
Scale
Title
Tolerance
NS-ISO 2768-1
SLEIPNER MOTOR AS
A3
N/A
Weight