Chapter
4
Techncial Information
TiM3xx Detecting Laser Scanner
30
© SICK AG · Germany · All rights reserved · Subject to change without notice
8014318/YK97/2015-04-27
Electrical installation
4.6.2
Switch
4.6.3
Connecting the supply voltage in the CDB730-001
Switch
Function
Default
S1
Supply voltage present:
ON: Supply voltage U
IN*
on
OFF: Supply voltage U
IN*
off
ON
S3
Supply potential for SGND:
ON: connected with GND of the
TiM3xx
ON (not changeable)
6
1
10
5
11
15
Wiring the power supply voltage in the CDB730-001 connection module
TiM3xx
CDB730-001
V
S
V
S
1
5
5
Shield
1
U
IN
2
GND
U
IN
*
GND
S1
F
Shield
D Sub HD
plug, 15-pin
GND
.
.
.
.
.
.
ON
OFF
S1 : POWER
DC 9 ... 28 V
U
IN
*
Switch S1:
ON:
Power supply voltage U
IN
switched to U
IN
*
via fuse to CDB730-001 and TiM3xx.
Power supply voltage U
IN
* additionally available on terminals 11 and 14.
OFF:
CDB730-001 and TiM3xx disconnected from power supply voltage.
Recommended position during all electrical installation work.
POWER
V
s
= DC 9 ... 28 V on terminal U
IN
= U
IN
* after fuse F and switch S1