7
Commissioning
7.1
Preparatory commissioning
Commissioning for preparatory purposes and under laboratory conditions differs in
some respects from commissioning in the target system.
In general, all safety and hazard warnings applicable to mounting (
) and electrical installation (
) must also be observed
under laboratory conditions. In addition, further notes must be taken into consideration
to guarantee the most effective preparation possible:
•
Only connect those devices to the product that you want to configure or program.
•
Operate the connected device in a controlled and contained network environment
for the time being to check network communication if necessary.
•
Note the company standards that apply to the use of checking and testing devices.
•
For initial programming, use ideal conditions for sensor or camera recognition.
•
Use the largest possible deviations from these ideal conditions to check the
programming with respect to its error tolerance and reliability, and to determine
error limit values.
Procedure
1.
Place the device on a non-slip base.
2.
Connect the required peripheral devices,
see "Connecting peripheral devices"
.
3.
Connect the network connection.
4.
Connect the voltage supply.
5.
The device requires a certain start-up time. The readiness is indicated by the
green "Dev RDY" LED.
COMMISSIONING
7