44
8011952/YWL2/3-0/2016-08| SICK
O P E R A T I N G I N S T R U C T I O N S | DUSTHUNTER C200
Subject to change without notice
3
ASSEMBLY AND INSTALLATION
3.3.2
General information, prerequisites
All assembly work previously described must be completed (as far as applicable) before
starting installation work.
Carry out all installation work onsite unless otherwise explicitly agreed with SICK or autho-
rized representatives. This includes laying and connecting the power supply and signal
lines, installing switches and power fuses and connecting the purge air supply.
3.3.3
Installing the purge air supply
▸
Lay the purge air hoses with shortest paths and free of bends, shorten as required.
▸
Maintain sufficient distance from hot duct walls.
Fig. 23: Underside of MCU-P
●
Plan adequate line cross-sections (
see “Technical Data”, page 111
●
Line ends with plugs to connect the sender/receiver unit must have sufficient free
length.
Purge air inlet
Purge air outlet DN 25
for sender/receiver unit and
reflector/scattered light
receiver DHC-R0
Purge air outlet DN 40
for reflector/scattered light
receiver DHC-R1