
12
DEFOR · Supplementary Operating Instructions · 8013029 V2.0 · © SICK AG
Installation Information
Su
bj
ec
t t
o c
han
ge
w
ith
ou
t n
ot
ic
e
3.1
Sample gas feed
▸
Observe the information on sample gas feed in the “Series GMS800” Operating Instruc-
tions.
3.2
Purge gas feed for process cuvette
Only valid for versions with process cuvette (option
In versions with process cuvette, the GMS800 enclosure has additional “purge gas inlet”
und “purge gas outlet” gas connections.
1
Install an external continuous purge gas supply for GMS800.
Suitable purge gas:
Chemically neutral gas (inert gas) or gas mixture suitable for dilut-
ing and transporting the measured gas without danger.
2
Feed the purge gas through the “purge gas inlet“ gas connection on the enclosure.
Allowable pressure and volume flow:
3
Install a gas line on the “purge gas outlet” through which the purge gas and emerged
sample gas are reliably discharged.
▸
Lead the gas line to a safe position where emerged sample gas cannot create any
danger.
▸
Recommendation:
Attach appropriate warning signs to the gas line or gas outlet
informing about the hazardousness of the sample gas.
Gas connections type and version
→
Supplementary Operating Instructions for
Enclosure