Ruler3000
Connection module,
i.e. CDB650
5
Power supply
24 V DC
4
Encoder
6
Photoelectric
switch
7
Ethernet cable
M12, 8-pin, X-coded
1
Power I/O cable
M12, 17-pin, A-coded
2
PC with Gigabit
Ethernet interface
3
Figure 3: Electrical connections for Ruler3000.
1
Ethernet cable, M12, 8-pin, X-coded
2
Power I/O cable M12, 17-pin, A-coded
3
PC with Gigabit Ethernet interface
4
Power supply 24 V DC
5
Connection module, i.e. CDB650
6
Encoder
7
Photoelectric switch
To prepare the camera for operation, do as follows:
1.
Remove the protection caps that cover the connections for Gigabit Ethernet (GigE)
and Power I/O on the back of the camera.
2.
Connect the Ethernet cable to the GigE connector on the camera. Connect the
other end of the Ethernet cable to the Network Interface Card (NIC) in the PC.
3.
Connect the connection module to the Power I/O connector on the camera using
the power I/O cable.
4.
Connect a 24V DC power supply to the connection module. 24V on terminal 1 and
GND on terminal 2.
5.
Switch on the power to the system.
For further information about the electrical installation, see
. The pin assignment is described in
"Electrical connections", page 34
. For
further information about the connection module, see
.
3.3
Installing PC software
Download and install the latest version of the
3D Stream SDK
and
the
Stream Setup Installer
from the SICK Support Portal,
.
For further information about the PC software and installation,
see
"Software installation", page 39
3.4
Capturing the first images
Before the device can be used in a machine vision system, it must be configured. This
is done by adjusting parameters in the
Stream Setup
software until the image result is
satisfactory.
GETTING STARTED
3
8026049//2021-04 | SICK
O P E R A T I N G I N S T R U C T I O N S | Ruler3000
13
Subject to change without notice