33
to observe antistatic protection measures when using the device in
office and technological premises, as well as during its storage.
Preparation sequence for tests are is given below with references to
the appropriate sections of this manual:
1. Preparation of the tool for service — see Section 6.1
2. Checking of the surface equipment to be available for service
(preparation for service) — see Section 4.4.1.
3. The level gauge assembly — see Section 4.4.2.
4. Setting of test parameters — see Section 5.3.4:
- setting of well cluster and well number, field number and test
type, required parameters of the test.
6.1. Preparation of the tool for service
The procedure of preparation of the tool for service is rather simple
and it involves the following operations:
1. Turn on the tool (see Section 5.3.5).
2. Check voltage of the cell and, when necessary, charge it
(Supplement 4).
3. Check a current time and, when necessary, correct it.) or to a
visual monitoring
4. Check the vacant storage capacity. If there is not enough room
for results of forthcoming work and data stored in the storage are still
important, it is necessary to save them by transferring them to a computer
(Supplement 5) unit.
5.
Turn off the tool.
The steps mentioned above take minimal time and it is
recommended to carry them out every day (every shift) before a working
shift. It is highly recommended to check the battery cell's voltage
beforehand in order to have time to charge it if necessary.
Содержание SUDOS-mini 2
Страница 2: ...2...
Страница 49: ...49 Figure 2...
Страница 50: ...50 Figure 3 Figure 4...
Страница 51: ...51 Figure 5 Figure 6...
Страница 52: ...52 Figure 7 Figure 8 Open the Control Panel System Device Manager tab...
Страница 54: ...54 Figure 9...