background image

Well sounders «DU-1» 

 

The  certificate  applies  to  “DU-1”  well  sounders  (hereinafter 

referred to as the device) designed for operation at the wellhead in oil and 
gas fields. 

The  device  is  explosion-proof  designed  (intrinsically  safe  circuit 

type of protection) in accordance with the requirements of GOST 31610.0-
2014 (IEC 60079-0:2011), GOST 31610.11-2014 (IEC 60079-11.), GOST 
31610:2011), and have 

 1Ex ib IIB T3 Gb Х 

explosion proof mark.

 

“DU-

1”  well  sounder  is  designed  for  indoor  and  outdoor  installation  in 
hazardous  areas  where  atmospheric  explosives  of  IIA,  IIB  categories  and 
T1, T2, T3 groups can form according to GOST  R IEC 60079-20-1-2011 
in  the  operating  temperature  range  from    -40  ºC  to  +50  ºC.  The  device 
design  is  comply  with  the  assigned  explosion  proof  mark,  with  the 
requirements  of  GOST  IEC  60079-14-2013  and  other  regulatory 
documents governing the use of electrical equipment in hazardous areas. 

The  operating  manual  contains  information  about  the  design, 

principle  of  operation  and  specifications  of  the  device  as  well  as 
instructions  necessary  for  proper  operation,  maintenance,  transportation 
and storage of the device. 

Observe  the  requirements  of  the  Federal  norms  and  regulations  in 

the field of industrial safety "Safety rules in oil and gas industry" as well as 
this manual, when operating, maintaining and repairing the device. 

The  device  may  only  be  operated  by  specially  trained  personnel 

who have studied the operating documentation for the device, received the 
relevant safety instructions and permission to work. 

 

Содержание DU-1

Страница 1: ...entific Industrial Introduction Company SIAM LLC WELL SOUNDERS DU 1 OPERATING MANUAL Explosion proof design type of explosion protection intrinsically safe circuit 1Ex ib IIB T3 Gb explosion proof mar...

Страница 2: ...Well sounders DU 1...

Страница 3: ...OFNESS OF THE PRODUCT 13 7 EQUIPMENT INSTALLATION AND DEINSTALLATION ORDER 16 7 1 Preparation of Test Objects for Echometry 16 7 2 Well sounder Installation 16 7 3 Well sounder Removal 17 8 BATTERY CH...

Страница 4: ...32 11 2 6 Replacement of the Valve Sealing Ring 33 12 DEVICE STORAGE AND TRANSPORTATION 34 APPENDIX 1 Control of Well Fluid Level in Complicated Conditions 35 APPENDIX 2 Setting Sound Speed Work Shee...

Страница 5: ...range from 40 C to 50 C The device design is comply with the assigned explosion proof mark with the requirements of GOST IEC 60079 14 2013 and other regulatory documents governing the use of electric...

Страница 6: ...31610 2011 and have 1Ex ib IIB T3 Gb explosion proof mark DU 1 well sounder is designed for indoor and outdoor installation in hazardous areas where atmospheric explosives of IIA IIB categories and T1...

Страница 7: ...r consists of 1 the case 2 thread connecting coupling 3 two shackles 4 the rotary retrievable outlet valve 5 the ON OFF button 6 the Power LED 7 the Charge LED 8 the plug for charging the in built acc...

Страница 8: ...e maintains its operability at ambient temperatures from minus 40 C to 50 C 2 3 The device operates autonomously and is powered by a special internal battery type EEMB LP103450LC PCM LD with 3 6 V or...

Страница 9: ...ing to the set shown in Table 2 Table 2 Title Q ty 1 Well sounder DU 1 1 2 Certificate 1 3 Operating manual 1 4 DB Siam 2 5 software user s guide 1 5 CD with the software 1 6 Package 1 7 Conformity ce...

Страница 10: ...rmed After the acoustic impulse is generated the rubber sphere should be kept in the position which it took immediately after the blow until the value of the measured level pops up on the screen The b...

Страница 11: ...y approved by the RTSA 5 2 Requirements to Personnel Well tests are to be carried out by individuals above 18 who have secondary education and who are medically cleared for work Personnel are to take...

Страница 12: ...tapers chokes hoppers and similar units The elbow of the offset should have pipe tapered thread 60 State Standard 633 80 and be located at the height 0 2 1 8 meters above the ground If the height exc...

Страница 13: ...ces The minimum width of conductors on the PCB is 0 2 mm copper thickness is not less than 18 m Thus the electrical circuit coming out of the battery compartment of the device is intrinsically safe Th...

Страница 14: ...hall be replaced by new ones supplied by the manufacturer 6 The device s operability is maintained at ambient temperature from minus 40 to plus 50 The maximum temperature of overheating of components...

Страница 15: ...osion proofness during operation Check that the cover of the battery compartment and the compartment itself including the threaded connection are free from mechanical damage and corrosion In case of c...

Страница 16: ...nnecting coupling of the sensor If the thread segment is worn out or significantly corroded or damaged well sounder installation is prohibited Open the valve on the offset for a short period of time 1...

Страница 17: ...on the terminal indicator In order to avoid leaks in thread connections use 402 dope 38 101 330 73 or 0 1 20 sealing band 6 05 1388 86 7 3 Well sounder Removal Switch off the device Close the valve of...

Страница 18: ...via an appropriate cable to a network or car adapter or USB port of your computer The charging time of a fully discharged battery is approximately 7 hours The voltage of a fully charged battery is 4 1...

Страница 19: ...mputer you must connect the sensor using Windows Add Bluetooth device The procedure for connecting may vary depending on the OS version The sensor must be turned on and ready for connection The sign o...

Страница 20: ...ck the right mouse button in the appeared context menu select item Open parameters see Figure 1 in the appeared Bluetooth Options window on the COM Ports tab see which outgoing port is assigned to the...

Страница 21: ...ers DU 1 Working with devices in DB SIAM To work with devices in the DB SIAM software start the program switch to the Settings tab press the Sensors button see Fig 3 the Sensors dialog box will appear...

Страница 22: ...blems a corresponding warning message appears This happens if the COM port is incorrectly specified or in case of the sensor is switched off If the error occurs because the sensor has been switched of...

Страница 23: ...Well sounders DU 1 If the connection is successful the sensor control panel appears For each sensor type the control panel will have a different look...

Страница 24: ...e sensor and allows the operator to save the study into the database at the moment when he is sure that he has correctly specified the well details and other study parameters If the operator has not s...

Страница 25: ...ed to specify what sound speed to use for level detection You can use one of the tables of correction tables of dependence of sound speed in annular space on pressure in annular space or set the value...

Страница 26: ...dy to start state and press the Start button 6 The Waiting for burst state would succeed the state Noise Measurement 7 Run the burst 8 The device will switch to the state of recording the echogram the...

Страница 27: ...e 10 2 Multi purpose Valve The multi purpose valve is supplied separately and is to be used in SUDOS well sounders and SIAM manufactured well sounders for generating an acoustic impulse by injecting g...

Страница 28: ...that allows to connect the conversion kit to the well sounder receiver The cylindrical receiver from GBO 2 kit is screwed on the outlet of the automatic valve unit or on the specialized manual valve o...

Страница 29: ...12 months Cleaning of the tapered connecting thread the acoustic sensor the well sounder and the case Maintenance of the exhaust valve Cleaning of accumulator charging socket Performance monitoring 1...

Страница 30: ...or When cleaning a very dirty thread application of metal tools an awl a screwdriver etc is allowed but do not apply an excessive force not to damage the thread It is strictly forbidden to use a metal...

Страница 31: ...nents are given in the Figure 1 guide bush 2 tappet 3 retaining ring 4 spring 5 sealing ring 6 nut 7 cone 8 housing Washing is done with diesel fuel or kerosene using a brush and a rag Before washing...

Страница 32: ...f valve housing Take out the guide bush 1 spring 4 tappet 2 in combination with cone 7 and nut 6 from valve housing 8 Then replace the cone 7 by unscrewing the nut 6 When necessary clean the contact c...

Страница 33: ...with CIATIM GOST 6267 80 lubricant Then the valve should be put in place After a final assembly of the well sounder it is necessary to carry out the integrity and strength tests First install the wel...

Страница 34: ...less than 80 Product transportation is allowed in a standard bag by any type of transport at the temperature from 50 to 50 Severe shock and vibration are to be avoided during transportation When stor...

Страница 35: ...f the original signal and usually difficult to read In the annular space a level of interference is very high what is caused by an excessive vibration of the tubing hanger and casing ESP vibration val...

Страница 36: ...of high interference are acoustic noises on the part of flowline In this case it is recommended to shut a casing valve of the flowline tree during measurement if it is not in conflict with the safety...

Страница 37: ...in one field range The device will show the level based on the preset sound speed General use sheets are recorded in the read only memory of the device obtained from averaged data for respective regio...

Страница 38: ...344 6 1 361 10 9 378 0 8 328 3 0 345 6 3 362 11 2 379 1 0 329 3 1 346 6 6 363 11 5 380 1 1 330 3 3 347 6 9 364 11 9 381 1 2 331 3 5 348 7 1 365 12 3 382 1 3 332 3 7 349 7 5 366 12 8 383 1 5 333 3 9 3...

Страница 39: ...speed m s 0 7 310 2 8 327 6 3 340 13 5 351 0 8 311 3 0 329 6 6 341 14 0 352 1 0 313 3 1 329 6 9 341 15 0 353 1 1 314 3 3 330 7 1 342 17 0 354 1 2 315 3 5 331 7 5 343 20 0 356 1 3 316 3 7 332 7 7 343...

Страница 40: ...E mail siamoil siamoil ru Web address http www siamoil ru For repair and maintenance of products manufactured by TSIIC SIAM LLC contact the service centers of the company 1 Service center in Neftejug...

Страница 41: ...Well sounders DU 1 4 Service center in Tomsk 3 Belaya Str Tomsk 634003 Russian Federation tel 3822 90 00 08 20 02...

Страница 42: ...Well sounders DU 1 REVISION RECORD SHEET Revi sion Numbers of sheets pages Total sheets pages of document Ref of docu ment Incoming of supporting document Signa ture Date Revised Replaced New Annulled...

Отзывы: