Page 7
STEP 3
MOUNTING THE KICKPLATE STRUCTURE
ITEMS
REQUIRED
KICKPLATE
STRUCTURE
PARTS BAG
1. Flip the TNT Rails and Head-End Stand over with the Foot-End resting on the ground.
(Pic 3.1)
2. Remove the 8 bolts (4 on each side) at the Foot-End of the TNT Rails. (Pic 3.2)
3. Position the Foot-End of the TNT Rails to the inside of the Kickplate Structure. Align the
holes and insert the 8 bolts into the rails and through the Kickplate Structure.
This job
requires two people.
(Pic 3.3)
4. Tighten down all bolts at the Kickplate Structure and Head-End Stand. (Pic 3.4)
5. Place 8 nut caps (4 on each side) from the Parts Bag onto the 8 lock nuts at the Kickplate
Structure.
Pictures are on the next page
Содержание TNT
Страница 2: ...Page 2 ...
Страница 8: ...Page 8 3 1 3 2 3 3 3 4 3 4 ...
Страница 10: ...Page 10 4 2 4 4 4 1 4 2 4 3 4 4 4 4 ...
Страница 14: ...Page 14 TNT WITH TOWERS ONLY The following two steps are for the ...
Страница 18: ...Page 18 ...
Страница 20: ...Page 20 ...