18
SHOWTEX INSTALLATION MANUAL
RAIL H100 ROPE CONTROLLED
5: Take the other rope end, the one still hanging out of the head pulley & pull it
down either through the weighted return pulley or the floor-fixed return pulley.
6: Take the same rope end and pull it up to the head pulley and then go through
the second guide wheel of the head pulley and walk to the centre of the rail.
1: Make sure the floor-fixed pulley is pulled out until its max height. When using
the weighted return pulley hold it 50 cm above the ground.
2: Tension the operating line by connecting the rope ends with the first rope
clamp. Tighten both bolts firmly to prevent the rope from slipping away.
SECURE THE DOUBLE BRAIDED ROPE
= 50 cm
= max height
Содержание Rail H100
Страница 1: ......
Страница 2: ...2 SHOWTEX INSTALLATION MANUAL RAIL H100 ROPE CONTROLLED ...
Страница 10: ...10 SHOWTEX INSTALLATION MANUAL RAIL H100 ROPE CONTROLLED SIDE AND EXPLODED VIEW BACK TO LIST ...
Страница 12: ...12 SHOWTEX INSTALLATION MANUAL RAIL H100 ROPE CONTROLLED SIDE AND EXPLODED VIEW BACK TO LIST ...
Страница 22: ...22 SHOWTEX INSTALLATION MANUAL RAIL H100 ROPE CONTROLLED Have a great show ...