16
SHOWTEX INSTALLATION MANUAL
RAIL H100 ROPE CONTROLLED
5: Fasten the bolts (M6) on the left and right sides hand tight, give an extra ½
turn to secure, even if the rails are already aligned! Do one side at a time.
6: Trace the inside of the rail with a finger. Realign the rail if you feel a gap or
height difference.
1: Make sure the rubber muffler faces the runners and or master carriers.
2: Fasten the bolt (M8) hand tight, give an extra ½ turn to secure.
1: Refer to page 9 (single track configuration) or 11 (double track configuration)
in order to insert the runners & carriers accordingly.
1: Loosen both bolts (M8).
2: Slide pulley into the rail.
3: Tighten both nuts (M8).
INSERT END STOPS
INSTALL HEAD PULLEY
INSERT RUNNERS AND / OR MASTER CARRIERS
1
3
2
Содержание Rail H100
Страница 1: ......
Страница 2: ...2 SHOWTEX INSTALLATION MANUAL RAIL H100 ROPE CONTROLLED ...
Страница 10: ...10 SHOWTEX INSTALLATION MANUAL RAIL H100 ROPE CONTROLLED SIDE AND EXPLODED VIEW BACK TO LIST ...
Страница 12: ...12 SHOWTEX INSTALLATION MANUAL RAIL H100 ROPE CONTROLLED SIDE AND EXPLODED VIEW BACK TO LIST ...
Страница 22: ...22 SHOWTEX INSTALLATION MANUAL RAIL H100 ROPE CONTROLLED Have a great show ...