Shining 3D EinScan SE/SP_User Manual_3.1.1
30
Rename projects
In case of name interference in the work folder when load a project, the loaded project will be
automatically renamed: “Name” → “Name_1”.
6.4.
Remove/Delete
Remove the project
Delete the selected data, group(s) or project(s)
Select one or many projects Click
remove
to remove the project(s) from the project tree, but not from
the work folder.
Click
Delete
or right click and delete to delete the selected data, group(s) or project(s) from the
project tree and the work folder.
If you remove or delete the current project the last project will reload and become the new current
project.
Note
: Delete only affects the data in the work. If the project is imported from other work, only the
created copy is deleted.