
20(29)
Picture 3
‑
4
:
European suction box
When SHD-E is mounted on the floor stand, suction box should be equipped, so
as to convey the dried plastic material conveniently. The installation of European
suction box and shut-off suction box is simple. Install them at bottom of the hopper,
point to the holes and tighten up the screws.
Picture 3
‑
5
:
Shut-off suction box
3.4.3 Blower Inlet Filter Installation
When dryers in the dust-contain environment or hot air requires high cleanliness, it
can option with AIF blower inlet filter.
Picture 3
‑
6
:
Right
:
AIF blower inlet filter
Содержание SHD-E
Страница 1: ...SHD E Standard Hopper Dryer Date Jul 2022 Version Ver C...
Страница 2: ......
Страница 5: ...5 29 Picture 3 7 HAR Hot air recycler 21 Picture 4 1 Control Panel 22...
Страница 16: ...16 29 the SHD E series...