2.
3.
1.
Outer casing bands
20 – 25 cm
SET
SET
Cable adjusting nut
SET
SET
While turning the crank arm, move the Revo-shift lever from to
and then from back to two or three times to check the
gear shifting.
Set the Revo-shift lever back to and check that the red line on
the push rod is aligned with the end of the hub axle.
Securing the shifting cable to the frame
Secure the cable to the frame with the outer casing bands.
2
1
3
1
3
2
Set the Revo-shift lever to .
Next, turn the cable adjusting bolt
until the red line on the push rod
is aligned with the end of the hub
axle.
The red line on the push rod and the end of
the hub axle should be aligned.
If the red line on the push rod is not visible, adjust so
that the yellow section of the link is between the two
yellow lines on the window.
Look at the two yellow
lines from directly above
during adjustment.
Note:
There should be enough
slack so that the cable is
not pulled too much
when the handlebars
are turned.
End of hub
axle
Red line on
push rod
Yellow line
Yellow line
Yellow section
of link
Cable adjusting
bolt
Push rod
Adjusting bell crank
If they are not aligned, turn the cable adjusting bolt to make
fine adjustments.
SET
SET
Set to
2
After adjusting the bell crank, tighten the cable adjusting nut to
secure the cable adjusting bolt.
Please note: Specifications are subject to change for improvement without notice. (English)
These service instructions explain how to use and maintain the Shimano
bicycle parts which have been used on your new bicycle.
For any questions regarding your bicycle or other matters which are not
related to Shimano parts‚ please contact the place of purchase or the
bicycle manufacturer.
Mar. 2000 by Shimano Inc. PIT. SZK. Printed in Singapore
C
One Holland Irvine CA 92618 U.S.A. Phone 949-951-5003
Industrieweg 24 NL-8071 CT Nunspeet‚ Holland Phone 31-341-272222
3-77 Oimatsucho‚ Sakai‚ Osaka‚ Japan Phone 0722-23-3243