9
3
Primary Operation
Primary Operation
4.2.7 Basic operation procedures for combined mode 3 ( , P.79=6)
The target frequency is determined by
communication
.
W
hen M0, M1, M2 and REX are ‘On’, the
target frequency will be determined by the
combination of multi-speed stage levels
(Please refer
to
P.4~P.6
,
P.80~P.84, P.86
). When
EXJ
is ‘On’, the target frequency will be determined by the set
value of
P.15
. Acceleration/deceleration time is set by the value of
P.16
. The starting of the inverter
is determined by
external terminals
. The functions of
P.996
,
P.998
and
P.999
can be accomplished
by
communication
.
4.2.8 Basic operation procedured for combined mode 4 ( , P.79=7)
The
target frequency
of the inverter is determined by the
external terminals
, external voltage
signals, external current signals, frequency set by pulse (
P.82
) or the combination of multi-speed
stage level terminals. The starting of the inverter is determined by
communication
(including
‘
Reset
’).
4.2.9 Basic operation procedures for combined mode 5 ( , P.79=8)
The target frequency is determined by the
operation panel
. When M0, M1, M2 and REX are ‘On’,
the target frequency is determined by the
combination of multi-speed stage levels
(Please refer to
P.4~P.6
,
P.80~P.84, P.86
). When
EXJ
is ‘On’, the target frequency will be determined by the set
value of
P.15
. Acceleration/deceleration time is set by the value of
P.16
. The starting of the inverter
is determined by
external terminals
.