
CapStar Feeder Installation/Maintenance Manual
26
Figure 4-1.
Conveyor Belt Replacement - Exploded View
SIDE
PLATE
TAIL PULLEY
COVER
DRIVE
COVER
BELT
DEAD
PLATE
IDLER
PULLEY
Step 2—Disconnect Electrical.
Remove the screws that are retaining
the electrical cords for both motors.
Step 3—Remove the Load Box.
Remove the (4) M8 screws that
mount the load box. Swing load box out of position and rest on
table or work bench.
Loosen bolts and remove both end covers and
the drive cover.
Step 4—Remove Drive Cover.
Remove the drive cover from the
conveyor (see
Figure 4-1
).
Step 5—Remove Tooling.
Step 6—Remove Covers.
Loosen bolts and remove tail pulley
cover.
Step 7—Remove Dead Plate
.