ShenPaz Blazir Скачать руководство пользователя страница 8

Ver 1.11 2018 

 

 

 

 

 

Connect the furnace to a grounded power outlet socket.  

 

Be certain that the power supply conforms to the electrical specifications of the 
Blazir. 

 

A single source of electricity must be used. 

 

 

2.4   Standards and approvals

 

CE Declaration of Conformity 

 

This  product  was  designed  and  manufactured  based  on  careful  selection  of  the 
harmonized standards to be observed, as well as additional technical specifications. It 
thus corresponds with the state-of-the-art and ensures maximum safety. 
 
In  terms  of  design  and  performance,  this  product  complies  with  the  European 
Directives  and  the  supplementary  national  requirements.  Conformity  has  been 
confirmed with the CE marking. The product's Declaration of Conformity. 

 

 

1.

 

CE 

 Tested to 61010-1:2001 (3rdEdition); EN61010-1;2001(3

rd

 Edition) 

2.

 

ICES-003 Issue 4:2004 CAN/CSA-CE/IEC CISPR 22:02 

3.

 

Intertek ETL Listed - Conforms to UL Std. 61010-1 Certified to CAN/CSA Std. 
61010-1 

 

 

 

                C        

   us

      

     

  

 

4006694

 

 

 

Conforms to UL Std. 61010-1 Certified CAN/CSA Std. 61010-1 

 

Содержание Blazir

Страница 1: ...Ver 1 11 2018 1...

Страница 2: ...ns 10 3 1 Delivery Scope 10 3 2 Intended Use 11 3 3 Components and Interfaces 12 3 4 Display screens overview and programming possibility 14 Icons 14 1 NEW PROGRAM 15 2 VIA SCREEN 18 3 PRESET PROGRAMS...

Страница 3: ...on of the heating rod elements 34 Dismantling the Furnace Cover 34 Earthing cable 34 Mounting the Heating Rods 34 Closing back the Furnace Cover 36 5 Electrical Connection 37 6 Start a Sintering progr...

Страница 4: ...G means that serious personal injury can occur DANGER means that serious personal injury can occur Other symbols in the Manual Important information that do not lead to hazards for humans or property...

Страница 5: ...ack you must be sure that the furnace is cold or below 300 C any other use can brake the furnace Heating element or burn the paint IF FURNACE IS SHUT OFF FROM BACK ROCKER SWITCH NO SECURITY PROTECT US...

Страница 6: ...ONS CAREFULLY BEFORE OPERATING THE FURNACE Only use ZrO2 powders with recognized approval for use in dental furnaces During use the area around the furnace table is very hot approach and contact with...

Страница 7: ...ply voltage fluctuations up to 10 of the nominal voltage e Transient over voltages typically present on the mains supply category II f Applicable rated pollution Degree 2 g distance fron electrical pl...

Страница 8: ...nal technical specifications It thus corresponds with the state of the art and ensures maximum safety In terms of design and performance this product complies with the European Directives and the supp...

Страница 9: ...ng Amendment 1 or a later version of the same standard incorporating the same level of testing requirements Class A equipment Equipment suitable for use in all establishments other than domestic and t...

Страница 10: ...1 High temperature furnace model name Blazir 4 SiC Heating rods 1 Mains cable 2 meters 1 Sintering tray After unpacking check the machine for completeness and possible transport damages Please claim a...

Страница 11: ...e intended for as well as the handling of hazardous substances or materials hazardous to one s health does not apply as under the intended use As to the materials being used in the furnace it must be...

Страница 12: ...Ver 1 11 2018 12 3 3 Components and Interfaces Figure 1 Main screen Fig 2 b Furnace door open Fig 2 c LCD touch screen Figure 2 Furnace overview front Figure 3 Top cover with exhaust airpipe...

Страница 13: ...Ver 1 11 2018 13 Figure 4 Mounted SiC heating rods furnace top Figure 5 Back panel connections MACHINE SPECIFIC Emergency switch Main rocker switch Ethernet connection Electric socket Fuse compartment...

Страница 14: ...Speed of heating up or down Target temperature the temperature the furnace is heating to Time of holding on Step Showing on the right of the screen a running cycle Blue is cooling and cold mode Red Fi...

Страница 15: ...NPAZ will appear for few seconds followed by the main screen There are 3 ways to start to operate the furnace 1 Add a new program 2 VIA system 3 Select existing preset programs 4 Figure 6 Main screen...

Страница 16: ...parameters a A screen will prompt you to choose a listed product and assign a new name After assigning a name presses create An editing screen will open to allow you to create your own program The Bla...

Страница 17: ...h color thus indicating to the user that the parameter setting is not within range of the furnace or missing b The product brand remains on default unless edited After assigning a name press ACCEPT An...

Страница 18: ...gram name from list or use the Generic option 2 VIA SCREEN By selecting the icon VIA simple sintering in the Main Screen you will access the Shenpaz easy sintering Wizard A limited list of tested ZrO...

Страница 19: ...e of 1 2 or 3 trays COOLING select normal or fast COLORING select YES or NO depending if using a colorant QUANTITY enter total quantity of crowns VIA will recommend a program in the Program Number fie...

Страница 20: ...access the preset list of programs in the furnace Scroll to the requested program you wish to run Figure 10 Program screen Highlight the chosen program press the icon pencil and the program parameter...

Страница 21: ...Ver 1 11 2018 21 Figure 11 Parameters screen...

Страница 22: ...ms are password protected Cannot be modified or erase Modifications are simply performed by selecting a field A keyboard pop up will appear modify value and save the program change to memory by pressi...

Страница 23: ...elevant flag the factory preset language may be changed TEMPERATURE SCALE change the temperature scale from Centigrade to Fahrenheit CALIBRATION This setting allows you to add or remove a constant tem...

Страница 24: ...ting FAST COOLING activates as part of the cycle an internal ventilation to cool faster the furnace SHUT OFF button It is highly recommended to logoff the furnace at the end of session Safe shutting d...

Страница 25: ...ician 1 In Admin password pop up screen place cursor into empty field 2 Keyboard will appear type password press Accept 3 Admin password screen will appear with hidden password press OK 4 Advanced set...

Страница 26: ...phone you can Edit VIA programs Products Add Create Remove products Connect to Network or WIFI for pairing with other devices CSV Update Software versions via PC only Edit Set furnace temperature offs...

Страница 27: ...igure 17 EDIT VIA SCREEN In this screen Shenpaz personnel modifies and adapts the Via preset to the different Zr product and loading PRODUCTS edit add create program names Figure 18 Advance setting sc...

Страница 28: ...urnace to a device via Network Connect your furnace to a PC to upload new software and programs Set the adaptor or the computer with the following setting Open the network connections on the PC Choice...

Страница 29: ...internet protocol version 4 TCPIP V4 then press on propriety and set detail as follow Type in your PC the set IP address 10 0 0 186 You are now connected to your furnace and you can see and operate yo...

Страница 30: ...Ver 1 11 2018 30 Network Preset for IT manager use only Those are the internal preset the furnace under Network HOW TO UPLOAD SINTERING PROGRAM FILES...

Страница 31: ...from the furnace to the PC The file will be stored in the Document Download CSV export How to upload Software Open a Chrome or Safari browser and write inside the address line 10 0 0 185 Press SW upda...

Страница 32: ...Ver 1 11 2018 32 In any case of error the following screen will appear and a sound will be audible TION EN 5 Installation...

Страница 33: ...erials can be reduced to 20 cm Minimum space requirements for the Blazir incl connections Width 1 4 m 0 8 m for non flammable materials Depth 0 9 m Height 1 0 m The set up surface must be level The ne...

Страница 34: ...ing Connect the heating elements one to the other in row Figure 17 Dismantling the furnace cover Earthing cable Unscrew four screws 2 using the Allen key 1 Remove the cover 3 Remove the earthing cable...

Страница 35: ...nst the furnace ceiling as shown above Fig 18 Mounting a heating rod Screw the connection terminals of the heating rods to the metal connection strips tightening torque approx 4 Nm Figure18 Screwing t...

Страница 36: ...th extreme caution It is essential to avoid jolting bending or turning of the heating rods EN Closing back the Furnace Cover Position the cover on top of the furnace in such a manner that the holes fo...

Страница 37: ...original Cable supply by Shenpaz Max length 1 5 M WARNING The mains cable may not be damaged Do not place objects on the mains cable Lay the mains cable in such a manner that nobody can step on or tri...

Страница 38: ...ance and cleaning Before carrying out furnace maintenance or in the event of a mechanical failure switch off the electrical supply by the POWER switch located at the back of the furnace and disconnect...

Страница 39: ...ent that this product proves defective within a period of the one 1 year of work from the date of shipment to Buyer Buyers exclusive remedy shall be at ShenPaz Dental Ltd option either replacement of...

Страница 40: ...1 11 2018 40 We thank you for choosing the Blazir Zirconia sintering furnace for your laboratory needs For any questions or additional support please contact us and we will look forward to assisting...

Страница 41: ...Ver 1 11 2018 41 11 Appendices...

Страница 42: ...Ver 1 11 2018 42...

Страница 43: ...Ver 1 11 2018 43 Hataasia 5 Migdal HaEmek 23101 Israel 97246666902 info shenpaz com...

Отзывы: