background image

05-201113-0E

Page 5

7. PROPERLY ANCHOR FRAME

A. 

Anchors must be placed inside shelter at the corners of the shelter. Insert a ¾" pipe or steel rod,  

              

    through the eyelet of the auger and screw the anchor into the ground until the eyelet is sticking out of the         

    ground by 1-2" so it can be anchored to the legs.

    If ground is too hard, dig a hole with a shovel or post hole tool. 

Optional: Fill with cement.

B. 

Wrap cable provided through the eyelet of the anchor and around the frame as indicated in Detail H. Secure  

     the cable with the clamps provided.

6. SqUARING UP THE FRAME

A. 

Place frame in its final location, which needs to be as flat and level as possible.

B. 

Measure across opposite corners. 

These distances must be equal to within 1".

C. 

Check that the front and rear of the frame measures 12' in width.

end rib anchors

NOTE:

15" Augers are for temporary use only!

We recommend 30" Augers be used,

4 minimum for use in a permanent installation.

wARNING:

Serious injury to persons or property could result if

cover is installed and shelter is not anchored and is

left unattended. Shelter must be securely anchored.

Содержание 12'x20'x8'

Страница 1: ...ShelterLogic LLC Shelters offer storage and protection from damage caused by sun light rain tree sap animal bird excrement and light snow Please anchor this ShelterLogic LLC structure properly See man...

Страница 2: ...e End Rib 2 Assemble middle Ribs 10224 10210 10114 10225 2 Bolts 3 Bolts 10224 10225 802630 10114 2 Bolts 3 Bolts 10226 10226 Base Feet Assembly 10270 01010 10114 10273 10273 10270 10273 10270 Secure...

Страница 3: ...races Cover Cross RailS End Rib ShelterLock Assembly 10210 01010 800260 020230 Use 020230 to connect Front end rib Use 020231 to connect Rear end rib End Rib Cross Rail Clamps 10115 10110 10112 01011...

Страница 4: ...wn in the illustration above You will receive one extra rib and the corresponding parts for every additional 4 ft of building length that you purchase The basic frame assembly will remain the same reg...

Страница 5: ...or and around the frame as indicated in Detail H Secure the cable with the clamps provided 6 Squaring up the Frame A Place frame in its final location which needs to be as flat and level as possible B...

Страница 6: ...g to remove the slack Be careful not to pull the webbing through the other side of the webbing pocket D Insert the S Hook on ratchet into hole on the leg bend Insert the webbing into the spindle of th...

Страница 7: ...t and pull tight Wind the ratchet so that the webbing overlaps itself C Disassemble cover rails and slide through fabric pockets at each leg and reattach with clamps to each leg Repeat this on other s...

Отзывы: