2013GK8005
-31-
5.5
Using the tapping screws for the whole door
1-
top roller bracket, 4 galvanized tapping screws 6.3x19
2-
middle hinge, 4 galvanized tapping screws 6.3x19
3-
side hinge with rollers, 6 galvanized tapping screws 6.3x19
4-
clevis pin lock, 6 galvanized tapping screws 6.3x19
5-
anti-break system, 6galvanized tapping screws 6.3x19
5.6
To install the cable in the cable drum
After installing the door and its accessories, to fix the cable terminal in the cable drum, to
circle the cable according to the direction of cable drum till fastened all the cables, to make
sure the bottom ant-break system being opening position, and do not obstruct the track
moving.
Содержание SSC150905
Страница 1: ...2013GK8005 SHELTER ASSEMBLY MANUAL MODEL SSC150905 L15 0 x W9 0 x H5 5m with overhead door...
Страница 5: ...2013GK8005 4...
Страница 9: ...2013GK8005 8 Roof Structure Planform Sidewall Sketch with Bracing Tube...
Страница 14: ...2013GK8005 13 Piture 2 1 Position the vertical track...
Страница 15: ...2013GK8005 14 Piture 2 2 Fix the vertical track...
Страница 17: ...2013GK8005 16 To fix the track of high lift parts for PB 3 lift way...
Страница 18: ...2013GK8005 17 Piture 2 4 Fix the horizontal curvely track PB 1 lift way PB 2 lift way...
Страница 19: ...2013GK8005 18 PB 4 lift way PB 5 lift way...
Страница 20: ...2013GK8005 19 3 To install the track hanger and buffer...
Страница 21: ...2013GK8005 20...
Страница 22: ...2013GK8005 21 To install the buffer...
Страница 23: ...2013GK8005 22 4 To install the balance system 4 1 the shaft and the spring...
Страница 24: ...2013GK8005 23 4 2 Position the shaft bracket 4 2 1 To make sure the position of shaft bracket...
Страница 25: ...2013GK8005 24...
Страница 31: ...2013GK8005 30 To install top roller bracket of PB 4 and PB 5 double track lift way...
Страница 35: ...2013GK8005 34 D the wire diameter X the number of fastening circle...