ASSEMBLY PROCEDURE 

1.

 

Prepare location and place all unit boxes near location sight. Perform an inventory check 
before beginning, to be certain all components are available for installtion. 

2.

 

Secure base plates flanges to base surface. 

3.

 

Assemble every group of arch. 

4.

 

Begin frame assembly with front end arch, first interior arch, purlins, etc. 

5.

 

Add to assemble other groups of arches. 

6.

 

Install main cover over frame.   

7.

 

Install end covers over end panels. 

Read all the detailed instructions and notices in the following assembly instructions! 

 

MAINTENANCE AND CARE 

1.

 

If some parts or the cover were accidently damaged during the use, contact the local supplier 
for advises on the repairing method or replacements, so that to prevent from further damage 
and keep the building in a good condition. 

2.

 

When replacing the parts, make certain the whole frame and the parts connected to the 
replaced parts be well fixed or supported. 

3.

 

Same with when attaching the cover, choose a windless day to replace the cover. Begin with 
making certain all the bolts of the frame and the tensioning equipments be well fixed. When 
taking off the cover, make sure the related ropes, etc. be taken off, and the cover will not be 
blocked during the way. Avoid taking off the cover with heavy big power equipments. 

4.

 

For the building with mechanical door. Keep the door closed if it is not used for long time. 
This helps the mechanical door to have a longer life. 

5.

 

To enlongate the life of the cover, put small duct tape or foam rubber (provide it by yourself) 
on the frame that comes to in contact with cover. The tape and foam rubber acts as a cushion 
to avoid rubbing damage to the cover over years. 

6.

 

Periodically(once in half a year or more often), the building should be completely inspected 
and maintained internally and externally to make certain the building remains properly 
installed and secured. Including: check all bolts and hardware connectors to be certain they 
are in place and tightened, the base plates are still fixed firmly, check and adjust the ropes if 
in need, clean the cover with suitable washing. Allowing dirt and debris to sit on cover over 
an extended time will damage cover irreparably. 

 

Thanks again for choosing this quality product. The following is the detailed assembly 
instructions for you starting the assembly. 

Содержание GS4070

Страница 1: ...MODEL G S4070 SHELTER L21 4xW12 2xH6 4M Assembly Manual ...

Страница 2: ...s or in wet location The cover of the building will protect against normal falling leaves and light debris however large fast or sharp falling items etc may cause a puncture or tear in the cover material So keep the building away from such harmful things Be careful with power and heat sources Don t keep heat sources near the tarpaulin Don t expose to open flame 4 Chose a windless day to install th...

Страница 3: ...ame and the tensioning equipments be well fixed When taking off the cover make sure the related ropes etc be taken off and the cover will not be blocked during the way Avoid taking off the cover with heavy big power equipments 4 For the building with mechanical door Keep the door closed if it is not used for long time This helps the mechanical door to have a longer life 5 To enlongate the life of ...

Страница 4: ...nd back panel 7 8 Base flange for sidewall 8 8A Base flange for wind brace support 4 9 Lower standing legs in back panel 2 10 Upper standing legs in back panel 2 11 Lower standing legs in the middle of back panel 1 12 Upper standing legs in the middle of back panel 1 13 Middle rail of back panel 6 13A Upper side rail of back panel 2 13B Lower side rail of back panel 4 14 Upper door track 2 14A Upp...

Страница 5: ...be at the bottom swaged 1 30 Hexagonal Bolt M10x30 40 31 Bolt M10x15 for tie down ratchet 32 32 Tie down ratchet 16 32A Band for tie down ratchet 16 34 Roof cover 1 35 Top cover above the door 1 36 Side cover beside the door 2 37 Door cover 1 38 Back cover 1 39 Rope for fastening the roof cover the door cover and the front back cover 41 Components for mechanical door 1set 42 Turnbuckle and steel w...

Страница 6: ...E ...

Страница 7: ... Base Flanges 6R 6L is critical to the alignment and fit of the frame components and cover Locate the Left Corner Base Flange and Right Corner Base Flange 6R 6L Secure the base flanges with Stake Pegs Part 25 Measurements shown in Figure 2 are to the center of the upright sockets on each Base Flange The Shelter must be secured to a firm surface that can receive and retain augers and pegs firmly in...

Страница 8: ...E ...

Страница 9: ......

Страница 10: ......

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Отзывы: