background image

 

 

 

Congratulations 

on your purchase of our instant shelter. This unit is a combination of 

excellent manufacturing and design. It is comprised of a rigid frame and a durable cover. For 
easy assembly, we have marked all the parts with codes. With proper installation, use and 
maintenance, your unit will provide many years of good and suitable service. 
 

READ ALL THE INSTRUCTIONS BEFORE ASSEMBLY

 

1.

 

The proper erection and installation of this building requires a high level of care and safety. 
We recommend the safety regulations be complied with during the installation. It includes 
but is not limited to: 

-

 

Safety hats, protective eyewear and protective clothing 

-

 

Safety harnesses for all elevated workers 

-

 

Proper ladder, cage, and safety operation 

2.

 

Site selection: Choose a solid level location for your building. Do not install the building 
where the ground could not keep the building steady. Do not install the building where the 
ground could not bear the weight of the building. Do not install the building in soft grass 
ground or wetland. 

3.

 

Be cautious with the surroundings. Keep work area clean. Do not set up it near snow drifts, in 
slippery places, or in wet location. The cover of the building will protect against normal 
falling leaves and light debris, however, large, fast or sharp falling items etc. may cause a 
puncture or tear in the cover material. So, keep the building away from such harmful things. 
Be careful with power and heat sources. Don’t keep heat sources near the tarpaulin. Don’t 
expose to open flame. 

4.

 

Chose a windless day to install the building. It is very difficult to attach the cover in heavy 
wind. 

5.

 

All snow accumulation on the main cover should be removed as soon as possible. Otherwise, 
when old snow on the roof becomes hard with new snow falling in, it will increase the 
burden of the roof badly and will damage the roof. 

6.

 

Try to keep the building, especially its base, in a dry condition. This will help the building to 
have a longer life than keeping it in a wet conditions. 

7.

 

The user should be responsible for the parts missing or damage occurred during the 
installation. 

8.

 

Don’t make alteration of the frame. Don’t hang anything besides included parts to the frame. 
Damages, consequential damages, or injuries caused by improper installation, alteration, 
improper use, or damages caused by snow, wind, or any acts of nature are owing to the user. 
The building is not intended for occupancy for any length of time. 

 

 

(This shelter should be installed on concrete foundation.)

Содержание GS4070

Страница 1: ...MODEL G S4070 SHELTER L21 4xW12 2xH6 4M Assembly Manual ...

Страница 2: ...s or in wet location The cover of the building will protect against normal falling leaves and light debris however large fast or sharp falling items etc may cause a puncture or tear in the cover material So keep the building away from such harmful things Be careful with power and heat sources Don t keep heat sources near the tarpaulin Don t expose to open flame 4 Chose a windless day to install th...

Страница 3: ...ame and the tensioning equipments be well fixed When taking off the cover make sure the related ropes etc be taken off and the cover will not be blocked during the way Avoid taking off the cover with heavy big power equipments 4 For the building with mechanical door Keep the door closed if it is not used for long time This helps the mechanical door to have a longer life 5 To enlongate the life of ...

Страница 4: ...nd back panel 7 8 Base flange for sidewall 8 8A Base flange for wind brace support 4 9 Lower standing legs in back panel 2 10 Upper standing legs in back panel 2 11 Lower standing legs in the middle of back panel 1 12 Upper standing legs in the middle of back panel 1 13 Middle rail of back panel 6 13A Upper side rail of back panel 2 13B Lower side rail of back panel 4 14 Upper door track 2 14A Upp...

Страница 5: ...be at the bottom swaged 1 30 Hexagonal Bolt M10x30 40 31 Bolt M10x15 for tie down ratchet 32 32 Tie down ratchet 16 32A Band for tie down ratchet 16 34 Roof cover 1 35 Top cover above the door 1 36 Side cover beside the door 2 37 Door cover 1 38 Back cover 1 39 Rope for fastening the roof cover the door cover and the front back cover 41 Components for mechanical door 1set 42 Turnbuckle and steel w...

Страница 6: ...E ...

Страница 7: ... Base Flanges 6R 6L is critical to the alignment and fit of the frame components and cover Locate the Left Corner Base Flange and Right Corner Base Flange 6R 6L Secure the base flanges with Stake Pegs Part 25 Measurements shown in Figure 2 are to the center of the upright sockets on each Base Flange The Shelter must be secured to a firm surface that can receive and retain augers and pegs firmly in...

Страница 8: ...E ...

Страница 9: ......

Страница 10: ......

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Отзывы: