17
|
P a g e
INSTALLATION
L
EVELING
Install the 4 leveling feet in the corner holes in the bottom of the oven. The oven must be level and
stable for safe operation.
Note:
To prevent damage when moving the unit, turn all 4 leveling feet so that the leg of each foot
sits inside the unit.
I
NSTALL THE
O
VEN
Place the unit in a workspace location that meets the criteria discussed in the previous entries of the
Installation section.
•
Verify that the oven stands level and does not rock. Adjust the leveling feet as needed.
•
A qualified technician may now connect the oven to its power source
.
I
NSTALLATION
C
LEANING
The manufacturer recommends cleaning the shelving and chamber before installing the shelving in
the chamber.
•
Remove all wrappings and coverings from shelving before cleaning and installing.
•
Do not clean with deionized water.
•
See the
topic in the User Maintenance chapter (page 33) for
information on how to clean the oven chamber and shelving.
Содержание SLFHP522-H
Страница 1: ...Installation Operation Manual SMO5HP 2 HIGH PERFORMANCE OVEN 220 240 Voltage...
Страница 8: ...8 P a g e INTRODUCTION...
Страница 12: ...12 P a g e RECEIVING...
Страница 20: ...20 P a g e SYMBOLS...
Страница 40: ...40 P a g e MAINTENANCE...